Commission passed order in the matter of Suo-Moto Determination of Generic Tariff for electricity generated from RDF based power projects
0
0
Commission passed order in the matter of Suo-Moto Determination of Generic Tariff for electricity generated from Refuse Derived Fuel (RDF) based power projects in the State of Telangana achieving Commercial Operation Date (COD) during the period from FY 2020-21 to FY 2023-24.
For more information please see below link:
Related posts:
- Commission passed order in the matter of Suo-Moto Determination of Variable Cost for existing Biomass, Bagasse and Industrial waste based power projects in the State of Telangana
- In the matter of: TSERC (Demand Side Management) Regulations, 2020
- TSERC: Determination of Pre-Fixed Levelized Tariff under Component A of PM KUSUM Scheme
- Misc. Order in the matter of Extension of the period of applicability of the benchmark capital cost and levellised generic tariff issued by the Commission for Solar Energy based plants
tags:
DETERMINE DISTRIBUTION LICENSEE electricity GENERIC TARIFF LEVELIZED TARIFF Refuse Derived Fuel Suo moto tariff TELANGANA TELANGANA STATE ELECTRICITY REGULATORY COMMISSION HYDERABAD TSERC