1. Home
  2. Tag "ists"

Petition for seeking relaxation of the procedure set out of Detailed Procedure for “Grant of Connectivity to Projects Based on Renewable Sources to Inter-State Transmission System” – EQ Mag Pro

Petition for seeking relaxation of the procedure set out of Detailed Procedure for “Grant of Connectivity to Projects Based on Renewable Sources to Inter-State Transmission System”. For more information please see below link:

Petition of the CERC (Connectivity and General Network Access to the interState Transmission System) Regulations of the connectivity grantees prior to commercial operation – EQ

Petition for adoption of tariff for 8800 MW Solar Power Plants connected to InterState Transmission System (ISTS) linked with Setting up of 2200 MW Solar Manufacturing Plant, selected through Competitive Bidding Process – EQ Mag Pro

Petition for adoption of tariff for 8800 MW Solar Power Plants connected to InterState Transmission System (ISTS) linked with Setting up of 2200 MW Solar Manufacturing Plant, selected through Competitive Bidding Process. For more information please see below link:

Petition of the CERC (Connectivity and General Network Access to the interState Transmission System) Regulations of the connectivity grantees prior to commercial operation – EQ

Petition for adoption of tariff for 2000 MW Solar Power Projects (Tranche-IX) connected to Inter-State Transmission System and selected through competitive bidding process – EQ Mag Pro

Petition for adoption of tariff for 2000 MW Solar Power Projects (Tranche-IX) connected to Inter-State Transmission System and selected through competitive bidding process. For more information please see below link:

Petition of the CERC (Connectivity and General Network Access to the interState Transmission System) Regulations of the connectivity grantees prior to commercial operation – EQ

Petition for adoption of tariff for 8800 MW Solar Power Plants connected to ISTS linked with setting up of 2200 MW Solar Manufacturing Plant – EQ Mag Pro

Petition for adoption of tariff for 8800 MW Solar Power Plants connected to ISTS linked with setting up of 2200 MW Solar Manufacturing Plant. For more information please see below link:

Petition of the CERC (Connectivity and General Network Access to the interState Transmission System) Regulations of the connectivity grantees prior to commercial operation – EQ

Petition for connectivity to the ISTS (inter-State transmission system) for a quantum of 500 MW, as a “bulk consumer” located at Moti Khavdi, Jamnagar, Gujarat – EQ Mag Pro

Petition for connectivity to the ISTS (inter-State transmission system) for a quantum of 500 MW, as a “bulk consumer” located at Moti Khavdi, Jamnagar, Gujarat. For more information please see below link:

Petition of the CERC (Connectivity and General Network Access to the interState Transmission System) Regulations of the connectivity grantees prior to commercial operation – EQ

Steps taken by the government to promote Renewable Energy – EQ Mag Pro

The installed Renewable energy capacity (including large hydro) has increased from 76.37 GW in March 2014 to 150.54 GW in November 2021, i.e. an increase of around 97%. The Government has taken several measures to promote renewable energy in the country. These include:- • Permitting Foreign Direct Investment (FDI) up to 100 percent under the […]

Role of prosumers in renewable energy adoption in India – EQ

Waiver of inter-state transmission charges on transmission of the electricity generated from solar and wind sources of energy under Para 6.4(6) of the Tariff Policy, 2016 – EQ Mag Pro

Waiver of inter-state transmission charges on transmission of the electricity generated from solar and wind sources of energy under Para 6.4(6) of the Tariff Policy, 2016. For more information please see below link:

How governments can best support consumers during this energy crisis – EQ

Petition for Adoption of Tariff for Solar PV Projects of 2000 MW and its Amendments Thereof.

Petition under Section 63 of the Electricity Act, 2003 for adoption of tariff for ISTS grid connected Solar Photo Voltaic Projects of 2000 MW selected through Competitive Bidding Process as per the Guidelines issued by Ministry of Power, Government of India on 3.8.2017 and its amendments thereof.    For more information please see below link:

Petition of the CERC (Connectivity and General Network Access to the interState Transmission System) Regulations of the connectivity grantees prior to commercial operation – EQ

NTPC Issues Tender For 600 MW  Wind-Solar Hybrid Power Projects

NTPC Issues Tender For 600 MW  Wind-Solar Hybrid Power Projects DEVELOPMENT OF ISTS CONNECTED WIND-SOLAR HYBRID POWER PROJECTS UP TO 600 MW ANYWHERE IN INDIA The last date to submit the bids is May 31, 2021 For more information please see below link:

NTPC Ltd issue Tender for Supply of Solar PV Modules for 1.2 GW Solar PV Projects at NTPC Rel Khavda RE Park-South Block in Rann of Kutch Gujarat – EQ