Benchmark costs for Off-grid Solar PV Systems and Solarisation of Grid Connected.Agricultural Pumps for the Year 2019-20 -reg. July 26, 2019 Anand Gupta 0+3-10 Featured Benchmark costs for Off-grid Solar PV Systems and Solarisation of Grid Connected.Agricultural Pumps for the Year 2019-20 -reg. For more information please see below link: Read more Pre-bid meeting: RfS for Supply of 1000 MW Excess Power from RE Projects having Existing PPA (SECI-FDRE-VIII) – EQ