1. Home
  2. Tag "OPEN ACCESS"

Petition with the GERC (Terms and Conditions for IntraState Open Access) Regulations of Medium Term Open Access from J.B. Renewable LLP to J.B. Ecotex LLP – EQ

Petition with the GERC (Terms and Conditions for IntraState Open Access) Regulations of Medium Term Open Access from J.B. Renewable LLP to J.B. Ecotex LLP For more information please see below link:

Petition of the CERC (Conduct of Business) Regulations for NRSS XXIX Transmission Ltd – EQ

Gentari Powers Up 150 MWp Open-Access Solar Plant to Boost Industrial Green Energy in Maharashtra – EQ

In Short : Gentari has commissioned a 150 MWp open-access solar plant in Yavatmal district, Maharashtra. The project enables direct power supply to commercial and industrial consumers, advancing clean energy use and reducing carbon emissions. Supporting local jobs and sustainability goals, this marks a significant step in India’s green transition and strengthens Gentari’s presence in the […]

India’s First FDRE Project by Juniper Green Signals a New Era of Reliable Renewable Power – EQ

Petition of HERC (Terms and conditions for grant of connectivity and open access for intra-State transmission and distribution system) Regulations, 2012 – EQ

Petition of HERC (Terms and conditions for grant of connectivity and open access for intra-State transmission and distribution system) Regulations, 2012 For more information please see below link:

Petition of the CERC (Conduct of Business) Regulations for NRSS XXIX Transmission Ltd – EQ

Petition of the CERC (Open Access in inter-State Transmission) Regulations for Standing Clearance for grant of Short Term Open Access for 19.2 MW capacity – EQ

Petition of the CERC (Open Access in inter-State Transmission) Regulations for Standing Clearance for grant of Short Term Open Access for 19.2 MW capacity For more information please see below link:

Petition of the CERC (Conduct of Business) Regulations for NRSS XXIX Transmission Ltd – EQ

Petition of the CERC (Grant of Connectivity, Long-Term Access and Medium Term Open Access in inter-State transmission and related matters) Regulations to Stage II Connectivity – EQ

Petition of the CERC (Grant of Connectivity, Long-Term Access and Medium Term Open Access in inter-State transmission and related matters) Regulations to Stage II Connectivity For more information please see below link:

Petition of the CERC (Conduct of Business) Regulations for NRSS XXIX Transmission Ltd – EQ

India’s Solar Open Access Surges in 2024 Amid Challenges to Renewable Growth – EQ

In Short : India added 6.9 GW of solar open access capacity in 2024, a 77% rise from 2023, driven by low-cost Chinese imports. Maharashtra led with 18% of installations, followed by Rajasthan and Karnataka. The total capacity reached 20.2 GW, but challenges like weak tender demand and project delays threaten India’s 500 GW renewable […]

India Achieves Record Renewable Power Generation in 2025, Reducing Fossil Fuel Dependence – EQ

Petition of the CERC (Grant of Connectivity, Long Term Access and Medium Term Open Access in inter State transmission and related matters) Regulations of long term access granted on the existing ISTS – EQ

Petition of the CERC (Grant of Connectivity, Long Term Access and Medium Term Open Access in inter State transmission and related matters) Regulations of long term access granted on the existing ISTS For more information please see below link:

Petition of the CERC (Conduct of Business) Regulations for NRSS XXIX Transmission Ltd – EQ