1. Home
  2. Tag "PPA & PSA : SELECTION OF SOLAR POWER DEVELOPERS FOR SETTING UP OF 150MW (50MW X 3) GRID CONNECTED FLOATING SOLAR POWER PROJECTS TO BE INSTALLED AT RIHAND DAM"

AMENDMENT-I, PPA & PSA : SELECTION OF SOLAR POWER DEVELOPERS FOR SETTING UP OF 150MW (50MW X 3) GRID CONNECTED FLOATING SOLAR POWER PROJECTS TO BE INSTALLED AT RIHAND DAM, UP

This has reference to the RfS No. SECI/C&P/SPD/RfS/150MW FLOATING/UP/R1/092018 dated 06.09.2018 regarding “Selection of Solar Power Developers for Setting up of 150MW (50MW x 3) Grid Connected Floating Solar Power Projects to be installed at Rihand Dam (also known as Govind Ballabh Pant Sagar Reservoir), Sonbhadra District, Uttar Pradesh”. The pre-bid meeting for the subject […]

Design, Fabrication, Supply, Installation, Testing, Commissioning And Operation For 5 Years Total 1280 kW Connected Solar PV Power Plant Nagpur In The State Of Maharashtra.