Petition of the CERC (Procedure, Terms and Conditions for Grant of Trading Licence and other Related Matters) Regulations, 2020 – EQ

Summary: — ### **1. Overview** This is a **Record of Proceedings** from the **Central Electricity Regulatory Commission (CERC)**, New Delhi, regarding **Petition No. 92/TD/2026**. – **Petitioner:** EKI Energy Services Limited (EESL) – **Date of Hearing:** 7th April 2026 – **Purpose:** Application under **Section 14** and **Section 15(1)** of the Electricity Act, 2003, read with **Regulation […]

Petition of the CERC (Connectivity and General Network Access to the interState Transmission System) Regulations of the connectivity grantees prior to commercial operation – EQ

In the matter of the CERC (Procedure, Terms and Conditions for Grant of Transmission License and other related matters) Regulations to Angul Sundargarh Transmission Ltd. – EQ

Summary: —- ### Key Dates & Compliance Timeline | Activity | Date | |———-|——| | Bidding process start | 29.03.2024 | | Bidding process concluded | 28.07.2025 | | Letter of Intent (LoI) issued | 19.06.2025 | | SPV acquired by H.G. Infra | 28.07.2025 | | Petition for transmission licence filed | 04.08.2025 (within […]

Petition of the CERC (Connectivity and General Network Access to the interState Transmission System) Regulations of the connectivity grantees prior to commercial operation – EQ

Petition with CERC (Procedure, Terms and Conditions for Grant of Transmission License and other related matters) Regulations to Bellary Davanagere Power Transmission Ltd. – EQ

Summary: — ## 📋 Two Petitions Filed ### Petition No. 133/TL/2026 | Field | Details | |——-|———| | **Subject** | Application under Sections 14 & 15 of the Electricity Act, 2003 read with CERC (Procedure, Terms and Conditions for Grant of Transmission License and other related matters) Regulations, 2024 | | **Purpose** | Seeking **grant […]

Petition of the CERC (Connectivity and General Network Access to the interState Transmission System) Regulations of the connectivity grantees prior to commercial operation – EQ

In the matter of Procedure for levying compensation charges to achieve milestones under the CERC (Connectivity and General Network Access to the inter-State Transmission System) Regulations – EQ

Summary: —- ### Background Statement: – Under GNA Regulations, Connectivity Applicants must achieve three key milestones: 1. **Submission of land documents** (50% of required land) 2. **Achieving Financial Closure (FC)** 3. **Achieving Commercial Operation Date (COD)** – Failure to meet timelines results in **revocation of Connectivity** and encashment of Bank Guarantees. – Many entities have […]

Petition of the CERC (Connectivity and General Network Access to the interState Transmission System) Regulations of the connectivity grantees prior to commercial operation – EQ

Petition of the CERC (Procedure, Terms and Conditions for grant of trading license and other related matters) Regulations for Neufin – EQ

Summary: — ## 📄 Case Overview | Parameter | Details | |———–|———| | **Petition No.** | 93/TD/2026 | | **Petitioner** | Neufo Technologies Private Limited (Neufin) | | **Application Type** | Grant of **inter-state trading license** under Section 14 of the Electricity Act, 2003 | | **License Category Sought** | **Category V** (as per Trading […]

Petition of the CERC (Connectivity and General Network Access to the interState Transmission System) Regulations of the connectivity grantees prior to commercial operation – EQ

Petition with the CERC (Procedure, Terms and Conditions for Grant of Transmission License and other related matters) Regulations for Morena-I SEZ Transmission Limited – EQ

Summary: — 1. **Implead additional Respondents** – The Petitioner shall implead: – All beneficiaries of the **Western Region**, – **M/s Apraava Energy Pvt. Ltd.**, – **MPPTCL** (Madhya Pradesh Power Transmission Company Limited). File an amended memo of parties within **three days**. 2. **Admission & Notice** – The petitions are **admitted**. Notice shall be issued to […]

Petition of the CERC (Connectivity and General Network Access to the interState Transmission System) Regulations of the connectivity grantees prior to commercial operation – EQ

Draft KERC (Procedure, Terms and Conditions for grant of Transmission License and other related matters) in respect of intra-State Transmission Projects selected through Tariff-Based Competitive Bidding – EQ

Summary: — ## Key Business Information | Parameter | Detail | |———–|——–| | **Issuing Authority** | Karnataka Electricity Regulatory Commission (KERC) | | **Notification Date** | 23 March 2026 | | **Gazette Publication Date** | 2 April 2026 (Thursday) | | **Comment Submission Deadline** | **Within 15 days from 2 April 2026** (approx. 17 April […]

Petition of the CERC (Connectivity and General Network Access to the interState Transmission System) Regulations of the connectivity grantees prior to commercial operation – EQ

Petition of the CERC (Procedure, Terms and Conditions for Grant of Trading License and other Related Matters) Regulations of Greenko Energies Private Ltd from Category III to Category I – EQ

Summary: — ## Business Summary: CERC Petition No. 136/TD/2026 – Greenko Energies ### Case Overview | Particulars | Details | |————-|———| | **Petitioner** | Greenko Energies Private Limited (GEPL) | | **Purpose** | Upgradation of inter-state trading license from **Category III to Category I** | | **Applicable Regulation** | CERC Trading Licence Regulations, 2020 | […]

Petition of the CERC (Connectivity and General Network Access to the interState Transmission System) Regulations of the connectivity grantees prior to commercial operation – EQ

Petition with CERC (Procedure, Terms and Conditions for Grant of Transmission License and other related matters) Regulations at Navinal (Mundra)(GIS) under RTM route – EQ

Summary: — ### **Project Specifics** – **Location:** Navinal (Mundra), Gujarat – **Purpose:** Transmission system for providing **connectivity to Renewable Energy (RE) applicants** at Navinal (Mundra) GIS (Gas Insulated Substation) – **Route:** **Regulated Tariff Mechanism (RTM)** – meaning the transmission asset will earn a regulated return on equity and cost-plus tariff, as opposed to competitive bidding […]

Petition of the CERC (Connectivity and General Network Access to the interState Transmission System) Regulations of the connectivity grantees prior to commercial operation – EQ

Petition with CERC (Procedure, Terms and Conditions for Grant of Transmission License and other related matters) Regulations to NERGS-I Power Transmission Limited – EQ

Summary: — **Case Background:** The petitioner, **NERGS-I Power Transmission Limited (NREGSPTL)** , filed a petition seeking a transmission license from the Central Electricity Regulatory Commission (CERC). The license was required to develop and operate an Inter-State Transmission System (ISTS) under the “North Eastern Region Generation Scheme-I (NERGS-I)” project. **Key Development & Petitioner’s Position:** During the […]

Petition of the CERC (Connectivity and General Network Access to the interState Transmission System) Regulations of the connectivity grantees prior to commercial operation – EQ