Petition with CERC (Procedure, Terms and Conditions for Grant of Transmission License and other related matters) Regulations to SR WR Power Transmission Limited – EQ

Summary: — ### 1. Background and Project Details – **Petitioner:** POWERGRID Parli Bidar Transmission Limited (a 100% subsidiary of Power Grid Corporation of India Limited). – **Purpose:** To establish an **Inter-Regional Strengthening between Southern Region (SR) Grid and Western Region (WR) Grid** on a **Build, Own, Operate, and Transfer (BOOT)** basis. – **Transmission Elements:** | […]

Petition of the CERC (Connectivity and General Network Access to the interState Transmission System) Regulations of the connectivity grantees prior to commercial operation – EQ

In the matter of the CERC (Procedure, Terms and Conditions for Grant of trading license and other related matters), Regulations of an inter- State trading license – EQ

Summary: —- #### 1. Subject Matter This petition is an application filed by **Energy Advisory Services Private Limited (EASPL)** under: – **Sections 14 and 15(1) of the Electricity Act, 2003** – **Regulation 6 of the CERC (Procedure, Terms and Conditions for Grant of Trading Licence and Other Related Matters) Regulations, 2020** (hereinafter “Trading Licence Regulations”) […]

Petition of the CERC (Connectivity and General Network Access to the interState Transmission System) Regulations of the connectivity grantees prior to commercial operation – EQ

Petition with CERC (Procedure, Terms and Conditions for Grant of Transmission License and other related matters) Regulations to KPS III HVDC Transmission Ltd – EQ

Summary: — ### 1. Key Regulatory Context | Parameter | Petition No. 27/TL/2026 | Petition No. 28/AT/2026 | | :— | :— | :— | | **Forum** | Central Electricity Regulatory Commission (CERC) | Central Electricity Regulatory Commission (CERC) | | **Petitioners** | Adani Energy Solutions Limited (AESL) and Anr. | Adani Energy Solutions Limited […]

Petition of the CERC (Connectivity and General Network Access to the interState Transmission System) Regulations of the connectivity grantees prior to commercial operation – EQ

Petition with CERC (Procedure, Terms and Conditions for Grant of Transmission License and other Related Matters) Regulation to TP Gopalpur transmission Limited – EQ

Summary: — **1. Parties Involved** – **Petitioner:** TP Gopalpur Transmission Limited (TPGTL) (formerly known as ERES-XXXIX Power Transmission Limited). – **Respondents:** Central Transmission Utility of India Limited (CTUIL) and Others. – **Regulatory Body:** Central Electricity Regulatory Commission (CERC). **2. Background & Procedural History** – The Petitioner had previously filed two similar petitions (**Petition No. 513/TL/2024** […]

Petition of the CERC (Connectivity and General Network Access to the interState Transmission System) Regulations of the connectivity grantees prior to commercial operation – EQ

In the matter with the CERC (Procedure, Terms and Conditions for Grant of Transmission License and other related matters) Regulations to POWERGRID Kudankulam Transmission Ltd – EQ

Summary: — ### Key Business & Legal Points #### 1. Transmission System Scope | Transmission Element | Scheduled COD | |———————|—————| | KNPP 3&4 – Tuticorin-II GIS PS 400 kV (quad) D/C line | December 31, 2026 | | 400 kV GIS line terminal equipment at Tuticorin-II GIS – 2 nos. | December 31, 2026 […]

Petition of the CERC (Connectivity and General Network Access to the interState Transmission System) Regulations of the connectivity grantees prior to commercial operation – EQ

In the matter of the CERC (Procedure, Terms and Conditions for grant of Trading Licence and other related matters) Regulations of ISTL in electricity from Category ‘V’ to Category ‘IV’ – EQ

Summary: — ### 1. Background of the Petitioner – **Petitioner:** Ideal Energy Solutions Private Limited, a company registered in Kolkata. – **Existing Licence:** The company was originally granted a **Category ‘V’ inter-State trading licence** by CERC on March 22, 2022, through Petition No. 262/TD/2021. – **Category ‘V’ Limit:** A Category ‘V’ licensee is permitted to […]

Petition of the CERC (Connectivity and General Network Access to the interState Transmission System) Regulations of the connectivity grantees prior to commercial operation – EQ

Petition with the CERC (Procedure, Terms and Conditions for Grant of Transmission License and other related matters) Regulations to SR WR Power Transmission Limited – EQ

Summary: — ### 1. Project Overview The project, titled **”Inter-Regional Strengthening between SR Grid and WR Grid,”** is a critical transmission scheme aimed at enhancing power transfer capability and facilitating the evacuation of renewable energy (RE) from the Southern Region. – **Project Scope (The “Project”):** – **Parli New (WR) – Bidar (SR) 765 kV D/C […]

Petition of the CERC (Connectivity and General Network Access to the interState Transmission System) Regulations of the connectivity grantees prior to commercial operation – EQ

Petition with CERC (Procedure, Terms and Conditions for Grant of Transmission License and other related matters) Regulations for Transmission system for providing connectivity at Navinal (Mundra)(GIS) under RTM route – EQ

Summary: —- **1. Overview of the Petition** – **Petition No:** 1029/TL/2025 – **Subject:** Application for the grant of a separate transmission license. – **Petitioner:** Navinal Transmission Limited (NNTL). – **Purpose:** To obtain a transmission license for a system at Navinal (Mundra) (GIS) under the Regulated Tariff Mechanism (RTM) route. This system is intended to provide […]

Petition of the CERC (Connectivity and General Network Access to the interState Transmission System) Regulations of the connectivity grantees prior to commercial operation – EQ

Petition with CERC (Procedure, Terms and Conditions for Grant of Transmission License and other related matters) Regulations to NERGS-I Power Transmission Ltd – EQ

Summary: —- **Key Procedural Development:** – **Withdrawal Petition:** The Petitioner (NREGSPTL) has now filed an Interlocutory Application (IA) – **IA (Diary) No.34/2026** – seeking permission to **withdraw** the main transmission license petition (No. 322/TL/2024). – **Objective of Withdrawal:** The Petitioner seeks liberty to file a **fresh petition** at a subsequent date. This suggests a need […]

Petition of the CERC (Connectivity and General Network Access to the interState Transmission System) Regulations of the connectivity grantees prior to commercial operation – EQ

Petition with CERC (Procedure, Terms and Conditions for Grant of Transmission License and other related matters) Regulations to KPS III HVDC Transmission Ltd – EQ

Summary: —- **Key Legal & Procedural Developments:** 1. **Compliance with Previous Orders:** ATL informed the Commission that it has complied with directions issued on January 21, 2026, by: – Impleading **KPS III HVDC Transmission Limited** as a co-petitioner. – Adding **Powergrid KPS3 Transmission Limited** and **South Olpad Transmission Limited** as respondents. 2. **Stakeholder Objections:** ATL […]

Petition of the CERC (Connectivity and General Network Access to the interState Transmission System) Regulations of the connectivity grantees prior to commercial operation – EQ