Petition for Manti Kisan Urja Suraksha Evam Utthaan Mahabhiyaan (PM-Kusum) Scheme of setting up grid connected solar power plants of individual capacity ranging from 500 KW to 2 MW under Component –A. For more information please see below link:
Petition for the approval of the power procurement of PSPCL from the 4 No. Solar PV Power Projects of 4 MW each to be established by PEDA. For more information please see below link:
Petition for determination of additional surcharge payable by open access consumers situated within the area of supply of PSPCL and purchasing power from within/ outside. For more information please see below link:
Petition of challenging the arbitrary and unreasonable actions of PSLDC in refusing the availability declaration of by GVK Power Limited for its 540 MW Thermal Power Plant. For more information please see below link:
Filing of Petition for approval of Annual Fixed Cost for 100 MW Malana-II Hydro-Electric Project for Multi Year Tariff (MYT) Control Period (FY 2017-18 to FY 2019-20) for True up of FY 2019-20. For more information please see below link:
Petition of the General Conditions of Tariff passed by this Commission and other relevant rules and Regulations as approved by the Commission. For more information please see below link:
REQUEST FOR PROPOSAL (RFP) FOR STUDY OF DETERMINING THE POWER INTENSIVE INDUSTRY (PIU) STATUS OF THE ELECTROPLATING INDUSTRIES, HARDENING FURNACES. For more information please see below link:
Feed-in-tariff for the purpose of Net billing and Gross metering arrangement under PSERC (Grid Interactive Rooftop Solar Photo Voltaic Systems) Regulations, 2021. For more information please see below link:
Petition of the Electricity Act for Adoption of Tariff for 150 MW Solar Power from Projects located in Punjab and Approval of Power Procurement. For more information please see below link: