Petition of the GERC (Conduct of Business) Regulations for extension of time period for commissioning of the Project to occurrence of unforeseen and uncontrollable events – EQ

Summary: —- **Core Matter:** The case involves a petition filed by **Bhathwari Technologies Limited** (the Petitioner) against **Gujarat Energy Transmission Corp. Limited** (GETCO, the Respondent). **Petitioner’s Request (Main Petition No. 2517 of 2025):** Bhathwari Technologies Limited sought directions from the Commission to extend the time period for commissioning its project capacity. The request was made […]

Petition of the CERC (Connectivity and General Network Access to the interState Transmission System) Regulations of the connectivity grantees prior to commercial operation – EQ

Petition of the CERC (Conduct of Business) and (Connectivity and General Network Access to the Inter-State Transmission System) (Third Amendment) Regulations – EQ

Summary: —- **Key Parties:** – **Petitioner:** Indosol Solar Private Limited (ISPL), a solar power generation company. – **Respondent:** Central Transmission Utility of India Limited (CTUIL), the central transmission utility. **Procedural Status & Key Developments:** 1. **Compliance Filed:** The Petitioner’s counsel informed the Commission that ISPL has complied with previous directives. A compliance affidavit dated February […]

Petition of the CERC (Connectivity and General Network Access to the interState Transmission System) Regulations of the connectivity grantees prior to commercial operation – EQ

In the matter of the CERC (Conduct of Business) and (Terms and Conditions of Tariff) Regulations for “Transmission System associated with Vindhyachal-V (500 MW) Project of NTPC (Part A)” in the Western Region – EQ

Summary: — ### 1. Background of the Asset – **Petitioner:** Power Grid Corporation of India Limited (POWERGRID). – **Respondents:** Distribution licensees and power departments in the Western Region (beneficiaries), including MPPMCL, MSEDCL, GUVNL, and NTPC Limited. – **Investment Approval:** Granted by POWERGRID’s Board on February 16, 2015, at an estimated cost of ₹6673.00 lakh (including […]

Petition of the CERC (Connectivity and General Network Access to the interState Transmission System) Regulations of the connectivity grantees prior to commercial operation – EQ

In the matter of the CERC (Procedure, Terms and Conditions for grant of Trading Licence and other related matters) Regulations of ISTL in electricity from Category ‘V’ to Category ‘IV’ – EQ

Summary: — ### 1. Background of the Petitioner – **Petitioner:** Ideal Energy Solutions Private Limited, a company registered in Kolkata. – **Existing Licence:** The company was originally granted a **Category ‘V’ inter-State trading licence** by CERC on March 22, 2022, through Petition No. 262/TD/2021. – **Category ‘V’ Limit:** A Category ‘V’ licensee is permitted to […]

Petition of the CERC (Connectivity and General Network Access to the interState Transmission System) Regulations of the connectivity grantees prior to commercial operation – EQ

Petition with the CERC (Procedure, Terms and Conditions for Grant of Transmission License and other related matters) Regulations to SR WR Power Transmission Limited – EQ

Summary: — ### 1. Project Overview The project, titled **”Inter-Regional Strengthening between SR Grid and WR Grid,”** is a critical transmission scheme aimed at enhancing power transfer capability and facilitating the evacuation of renewable energy (RE) from the Southern Region. – **Project Scope (The “Project”):** – **Parli New (WR) – Bidar (SR) 765 kV D/C […]

Petition of the CERC (Connectivity and General Network Access to the interState Transmission System) Regulations of the connectivity grantees prior to commercial operation – EQ

Petition with CERC (Procedure, Terms and Conditions for Grant of Transmission License and other related matters) Regulations for Transmission system for providing connectivity at Navinal (Mundra)(GIS) under RTM route – EQ

Summary: —- **1. Overview of the Petition** – **Petition No:** 1029/TL/2025 – **Subject:** Application for the grant of a separate transmission license. – **Petitioner:** Navinal Transmission Limited (NNTL). – **Purpose:** To obtain a transmission license for a system at Navinal (Mundra) (GIS) under the Regulated Tariff Mechanism (RTM) route. This system is intended to provide […]

Petition of the CERC (Connectivity and General Network Access to the interState Transmission System) Regulations of the connectivity grantees prior to commercial operation – EQ

In the matter of CERC (Conduct of Business) and (Terms and Conditions of Tariff) Regulations at Tuticorin-II GIS in the Southern Region – EQ

Summary: —- **1. Overview of the Petition** – **Petitioner:** Power Grid Corporation of India Limited (PGCIL). – **Purpose:** 1. **Truing-up** of Annual Fixed Charges (AFC) for the 2019-24 tariff period (based on 2019 Tariff Regulations). 2. **Determination** of AFC for the 2024-29 tariff period (based on 2024 Tariff Regulations). – **Asset in Question:** – **Asset […]

Petition of the CERC (Connectivity and General Network Access to the interState Transmission System) Regulations of the connectivity grantees prior to commercial operation – EQ

In the matter of CERC (Conduct of Business) and (Terms and Conditions of Tariff) Regulations with bays at Wardha under “Mauda Transmission System” in the Western Region – EQ

Summary: —- **1. Overview of the Petition** – **Petitioner:** Power Grid Corporation of India Limited (PGCIL). – **Purpose:** 1. **Truing-up** of Annual Fixed Charges (AFC) for the 2019-24 tariff period (based on 2019 Tariff Regulations). 2. **Determination** of AFC for the 2024-29 tariff period (based on 2024 Tariff Regulations). – **Asset in Question (Combined Asset):** […]

Petition of the CERC (Connectivity and General Network Access to the interState Transmission System) Regulations of the connectivity grantees prior to commercial operation – EQ

Petition with CERC (Procedure, Terms and Conditions for Grant of Transmission License and other related matters) Regulations to NERGS-I Power Transmission Ltd – EQ

Summary: —- **Key Procedural Development:** – **Withdrawal Petition:** The Petitioner (NREGSPTL) has now filed an Interlocutory Application (IA) – **IA (Diary) No.34/2026** – seeking permission to **withdraw** the main transmission license petition (No. 322/TL/2024). – **Objective of Withdrawal:** The Petitioner seeks liberty to file a **fresh petition** at a subsequent date. This suggests a need […]

Petition of the CERC (Connectivity and General Network Access to the interState Transmission System) Regulations of the connectivity grantees prior to commercial operation – EQ

Petition for Adoption of 6000 MWh Peak Power from ISTS- connected Renewable Energy Power Projects with Energy Storage System anywhere in India – EQ

Summary: —- **Key Regulatory Developments:** 1. **Compliance with Previous Orders:** SJVNL informed the Commission that it has complied with directions from the January 21, 2026 hearing. It filed an affidavit on February 4, 2026, providing details regarding the competitiveness of the discovered tariff. 2. **Power Sale Agreement (PSA) Progress:** – SJVNL has entered into a […]

Petition of the CERC (Connectivity and General Network Access to the interState Transmission System) Regulations of the connectivity grantees prior to commercial operation – EQ