Petition of the CERC (Sharing of Inter-State Transmission Charges and Losses) Regulations for PGPL) and Ors. – EQ

Summary: — ### Proceedings & Directions 1. **CTUIL sought additional time** – The counsel for Respondent CTUIL requested more time to file its reply in the matter. 2. **Other Respondents (PGCIL & PGBTLL)** – Their counsel submitted that they have **already filed** their reply. 3. **Petitioners’ request** – The counsel for PGPL sought: – Liberty […]

Petition of the CERC (Connectivity and General Network Access to the interState Transmission System) Regulations of the connectivity grantees prior to commercial operation – EQ

Petition with the CERC (Procedure, Terms and Conditions for Grant of Transmission License and other related matters) Regulations for Morena-I SEZ Transmission Limited – EQ

Summary: — 1. **Implead additional Respondents** – The Petitioner shall implead: – All beneficiaries of the **Western Region**, – **M/s Apraava Energy Pvt. Ltd.**, – **MPPTCL** (Madhya Pradesh Power Transmission Company Limited). File an amended memo of parties within **three days**. 2. **Admission & Notice** – The petitions are **admitted**. Notice shall be issued to […]

Petition of the CERC (Connectivity and General Network Access to the interState Transmission System) Regulations of the connectivity grantees prior to commercial operation – EQ

Petition of CERC (Connectivity and General Network Access to the Inter-State Transmission System) Regulations of the land required for grant of final connectivity – EQ

Summary: — ### Reliefs Sought by SUCRL (Main Petition & IAs) 1. Relax timeline for land document submission – allow **12 months from final grant** or **12 months from issuance of coordinates** (instead of 18 months from in‑principle grant). 2. Alternatively, permit land document submission **18‑24 months before start date (31.12.2029)**. 3. Transfer/reallocate connectivity to […]

How governments can best support consumers during this energy crisis – EQ

Petition of the CERC (Connectivity and General Network Access to the interstate Transmission System) (Third Amendment) Regulations of Hybrid Power Project – EQ

Summary: — ## Key Business Facts | Parameter | Detail | |———–|——–| | **Petitioner** | VEH Jayin Renewables Private Limited (VJRPL) | | **Respondent** | Central Transmission Utility of India Limited (CTUIL) | | **Total Project Capacity** | 151.8 MW (Hybrid Project) | | **Additional Capacity Sought** | 45 MW (Solar) | | **Connectivity Point** […]

Petition of the CERC (Connectivity and General Network Access to the interState Transmission System) Regulations of the connectivity grantees prior to commercial operation – EQ

Petition of the CERC (Connectivity and General Network Access to the inter-State Transmission System) Regulations of VSUPL – EQ

Summary: — ## Key Business Details | Parameter | Detail | |———–|——–| | **Petitioner** | VEH Saur Urja Private Limited (VSUPL) – Solar power generator | | **Respondent** | Central Transmission Utility of India Limited (CTUIL) | | **Project Capacity** | 81.9 MW (verge of commissioning) | | **Original Connectivity Granted** | 162.3 MW (later […]

Petition of the CERC (Connectivity and General Network Access to the interState Transmission System) Regulations of the connectivity grantees prior to commercial operation – EQ

Petition with CERC (Change in Law) of Transmission Service Agreement related to POWERGRID Neemuch Transmission System Ltd – EQ

Summary: — ### Key Business Points **1. Nature of Petition:** – **Legal Basis:** Filed under **Sections 63 and 79** of the Electricity Act, 2003, read with **Article 12 (Change in Law)** of the Transmission Service Agreement dated 24.08.2022. – **Purpose:** To seek relief or tariff adjustment due to an event classified as “Change in Law,” […]

Petition of the CERC (Connectivity and General Network Access to the interState Transmission System) Regulations of the connectivity grantees prior to commercial operation – EQ

Petition for Adoption of Transmission Charges with respect to the Transmission System being established by the SR and ER Power Transmission Ltd – EQ

Summary: — ### Key Business Points **1. Nature of Petitions:** – **Petition No. 120/AT/2026:** Filed under **Section 63 of the Electricity Act, 2003**. Seeks adoption of transmission charges discovered through a **Tariff Based Competitive Bidding (TBCB)** process. This allows the Commission to adopt the tariff discovered via competitive bidding without further scrutiny, ensuring cost efficiency. […]

Petition of the CERC (Connectivity and General Network Access to the interState Transmission System) Regulations of the connectivity grantees prior to commercial operation – EQ

Petition of the CERC (Procedure, Terms and Conditions for Grant of Trading License and other Related Matters) Regulations of Greenko Energies Private Ltd from Category III to Category I – EQ

Summary: — ## Business Summary: CERC Petition No. 136/TD/2026 – Greenko Energies ### Case Overview | Particulars | Details | |————-|———| | **Petitioner** | Greenko Energies Private Limited (GEPL) | | **Purpose** | Upgradation of inter-state trading license from **Category III to Category I** | | **Applicable Regulation** | CERC Trading Licence Regulations, 2020 | […]

Petition of the CERC (Connectivity and General Network Access to the interState Transmission System) Regulations of the connectivity grantees prior to commercial operation – EQ

In the Matter of Directions for CERC (Deviation Settlement Mechanism and Related Matters) Regulations, 2024 – EQ

Summary: — ## 1. Background – Regulation 9(7) of DSM Regulations, 2024 Regulation 9(7) governs how a **deficit in the Deviation & Ancillary Service (DAS) Pool Account** is settled across regions and recovered from **Designated ISTS Consumers (DICs)**. ### Two recovery mechanisms under Regulation 9(7): | Period | Recovery Mechanism | | :— | :— […]

Petition of the CERC (Connectivity and General Network Access to the interState Transmission System) Regulations of the connectivity grantees prior to commercial operation – EQ

In the matter of CERC (Conduct of Business) and (Terms and Conditions of Tariff) Regulations for Truing up and determination of the transmission tariff under “System Strengthening-XXIV” in the Southern Region – EQ

Summary: — ## **1. Assets Covered (Combined Asset)** | Asset | Description | COD | Time Overrun (condoned) | | :— | :— | :— | :— | | **Asset-A** | LILO of Kurnool–Thiruvalam 765kV D/C line + 765/400kV GIS substation at Cuddapah (2×1500 MVA ICT + 2×240 MVAR bus reactors) | 25.10.2018 | 106 […]

Petition of the CERC (Connectivity and General Network Access to the interState Transmission System) Regulations of the connectivity grantees prior to commercial operation – EQ