Sanction for the “Scheme for Setting-up of 2500 MW ISTS-connected Wind-Solar Hybrid Power Projects” May 26, 2018 Anand Gupta 000109 Featured Sanction for the “Scheme for Setting-up of 2500 MW ISTS-connected Wind-Solar Hybrid Power Projects”. For more information please see below link: Source: mnre.gov.in Read more National Workshop on RE integration through ESS Phase-II to be held on 30.04.2026 in hybrid mode – reg. – EQ