Petition for Approval of Annual Revenue Requirement (ARR) and Tariff Proposal for FY 2020-21

  IN THE MATTER OF : Petition for Approval of Annual Revenue Requirement (ARR) and Tariff Proposal for FY 2020-21for The State of Arunachal Pradesh under Sections 61, 62 and 64 of The Electricity Act 2003 For more information please see below link:  

Petition for Adoption of Tariff of 1200 MW ISTS Grid connected Wind – Solar Hybrid Power projects on anywhere in India with “Green-Shoe Option” by Ministry of Power – EQ

In the matter of: Petition seeking approval on the draft plan to pass on the benefit in electricity tariff to the end consumers of the State

  In the matter of: Petition seeking approval on the draft plan to pass on the benefit in electricity tariff to the end consumers of the State For more information please see below link:

Petition for Adoption of Tariff of 1200 MW ISTS Grid connected Wind – Solar Hybrid Power projects on anywhere in India with “Green-Shoe Option” by Ministry of Power – EQ

Petition for determination of tariff of balance period of 10 years of PPA for its Solar PV plant

  Petition filed under Section 62 (1) (a) of the Electricity Act, 2003 and provisions of RERC (Terms and Conditions for Determination of Tariff for Renewable Energy Sources -Wind and Solar Energy) Regulations, 2014 for determination of tariff of balance period of 10 years of PPA for its Solar PV plant. Solar Power Projects (For […]

Petition for Adoption of Tariff of 1200 MW ISTS Grid connected Wind – Solar Hybrid Power projects on anywhere in India with “Green-Shoe Option” by Ministry of Power – EQ

Tripura Regulator determines levelised tariff at Rs. 3.31 /kwh for a period of 25 years

In the Matter Of: Petition for determination of prefixed levelised tariff for purchase of Solar Power by Tripura State Electricity Corporation Limited from decentralized Solar Power Plants and other Renewable Energy Generating Plant of Farmer / Developer having capacity of 500 kw to 2000 kw in the vicinity of Rural grid Sub-Station under Component-A of […]

Petition for Adoption of Tariff of 1200 MW ISTS Grid connected Wind – Solar Hybrid Power projects on anywhere in India with “Green-Shoe Option” by Ministry of Power – EQ

To accord approval for the proposed implementation of the KUSUM (Component C) Agricultural Solar Pump Scheme in 20,000 pump sets with 7.5 H.P load by installing 11 kW solar PV plant in each of the pump sets

  Tamil Nadu Energy Development Agency (TEDA)/ To accord approval for the proposed implementation of the KUSUM (Component C) Agricultural Solar Pump Scheme in 20,000 pump sets with 7.5 H.P load by installing 11 kW solar PV plant in each of the pump sets. ORDER 1. Prayer of the Petitioner in M.P. No.2 of 2020:- […]

Petition for Adoption of Tariff of 1200 MW ISTS Grid connected Wind – Solar Hybrid Power projects on anywhere in India with “Green-Shoe Option” by Ministry of Power – EQ

Trump Wins Fight to Close Solar-Tariff Loophole He Granted

Administration has pushed for months to end exemption Solar group considering new challenge against proclamation The Trump administration scored a legal victory allowing it to remove an exemption for tariffs on certain imported solar panels after being thwarted for months in court. A U.S. trade judge on Thursday ruled that a proclamation President Donald Trump […]

Central America’s Solar Revolution and the Rooftop Revolution in the U.S. -EQ

Tariff of Rs. 4.50/kwh determined by KERC is applicable to the Wind Power Projects of the appellants for a period of 25 years

  Tariff of Rs. 4.50/kwh determined by KERC is applicable to the Wind Power Projects of the appellants for a period of 25 years CONCLUSION 84. For the foregoing reasons, the reliefs sought by the appellants deserve to be granted. We, thus, direct as under: (i.)The order dated 04.09.2017 of the respondent Karnataka Electricity Regulatory Commission […]

Petition for Adoption of Tariff of 1200 MW ISTS Grid connected Wind – Solar Hybrid Power projects on anywhere in India with “Green-Shoe Option” by Ministry of Power – EQ

Amendments to the Guidelines for Tariff Based Competitive Bidding Process for Procurement of Round-The Clock Power

Amendments to the Guidelines for Tariff Based Competitive Bidding Process for Procurement of Round-The Clock Power from Grid Connected Renewable Energy Power Projects, complemented with Power from Coal Based Thermal Power Projects For more information please see below link:

Decarbonizing India’s Fertilizer Sector and Strengthening The Nation’s Energy Security – EQ