Home Tag "Testing"

Leak Testing Meets New Energy Storage Needs

Leak tightness is a major criterion for stable performance of a battery pack over the expected lifetime of an electrical vehicle. Since the early 1990s Lithium ion batteries have entered industrial markets as energy storage technology for mobile consumer electronics and battery-operated tools. More recently, Li ion batteries have broken into new markets like battery […]

IESA seeks policy measures to boost energy storage

Renewable Energy Test Center Provides New Battery and Energy Storage System Testing Services with VDE Renewables

New North American service for advanced, full-service energy storage testing to assist customers in ensuring bankability and predictive modeling for battery technologies FREMONT, Calif. : As global demand expands for reliable energy storage and battery technologies to pair with solar, Renewable Energy Test Center and VDE Renewables are partnering to provide a new level of performance and reliability […]

IESA seeks policy measures to boost energy storage

Supply Transportation Manual Carriage installation testing and Commissioning of 10No 40watt LED Based Solar Street Lights for Shri Amarnath Ji Yatra 2019

Supply Transportation Manual Carriage installation testing and Commissioning of 10No 40watt LED Based Solar Street Lights for Shri Amarnath Ji Yatra 2019 Tender Value in Rs.: 4,60,000 For more information please see below link:

PERC Solar Module Market Climbs on Positive Outlook of Booming Sales | Biggest Opportunity of 2020

Bid for Design, Engineering, Supply & Procurement, Construction, Erection, Testing, Commissioning, Operation and Maintenance of Solar Photovoltaic Grid-Connected Power Plants of 1 x 50MW (AC) at Dholera Solar Park, Dist: Ahmedabad & 1x 100 MW at Raghanesda Ultra Mega Solar Park, Tal: Vav, Dist. Banaskantha, Gujarat

Bid for Design, Engineering, Supply & Procurement, Construction, Erection, Testing, Commissioning, Operation and Maintenance of Solar Photovoltaic Grid-Connected Power Plants of 1 x 50MW (AC) at Dholera Solar Park, Dist: Ahmedabad & 1x 100 MW at Raghanesda Ultra Mega Solar Park, Tal: Vav, Dist. Banaskantha, Gujarat. For more information please see below link:

Solar Power based Pulse Charger

NIT for Design Engineering Procurement Supply Construction Erection Testing Commissioning Associated Transmission System and Comprehensive Operation Maintenance of 1.700 MW(AC) Solar PV Power Plant With Battery Energy Storage System at A and N

NIT for Design, Engineering ,Procurement ,Supply ,Construction ,Erection, Testing ,Commissioning, Associated Transmission System and Comprehensive Operation Maintenance of 1.700 MW(AC) Solar PV Power Plant With Battery Energy Storage System at A and N For more information please see below link:

Solar Power based Pulse Charger

EXTENSION OF BID SUBMISSION DEADLINE-I : TENDER FOR DESIGN, ENGINEERING, PROCUREMENT, SUPPLY, CONSTRUCTION, ERECTION, TESTING, COMMISSIONING AND O&M OF 50 MW (AC) SOLAR PHOTO VOLTAIC POWER PLANT AT KASARGOD SOLAR PARK, KERALA

This has reference to the RfS No. SECI/C&P/NIT/2019/THDC50 dated 08/02/2019 regarding Design, Engineering, Procurement, Supply, Construction, Erection,  Testing, commissioning and O&M of 50 MW (AC) Solar PV Power Plant at Kasargod Solar Park, Kerala The last date of bid submission (both online and offline) is hereby extended till 04.04.2019 (14:00 HRS). The techno-commercial bid opening shall be […]

PERC Solar Module Market Climbs on Positive Outlook of Booming Sales | Biggest Opportunity of 2020

Open chat