1. Home
  2. Tag "THERMAL POWER PROJECTS"

Amendments to the Guidelines for Tariff Based Competitive Bidding Process for Procurement of Round-The Clock Power

Amendments to the Guidelines for Tariff Based Competitive Bidding Process for Procurement of Round-The Clock Power from Grid Connected Renewable Energy Power Projects, complemented with Power from Coal Based Thermal Power Projects For more information please see below link:

Webinar: Rajasthan Grid Interactive RE Systems Regulations 2021

Future thermal power plants at risk as water stress increases: Study

Existing water shortage has already forced 61 thermal power plants to shut down between 2013 and 2017, leading to 17,000 gigawatt hours of lost generation The country’s coal-fired thermal power generating stations face a bleak future with the ongoing water shortage crisis set to worsen. The existing water shortage problems have forced 61 thermal power […]

India Adds 12.1 GW Power Generation Capacity in FY21: Report