Application in respect of termination of PPA signed between the parties for Procurement of 107 MW of power on long term basis

  Application for adjudication of dispute between Beta Infratech Private Limited and Uttarakhand Power Corporation Limited in respect of termination of Power Purchase Agreement dated 01.03.2017 signed between the parties for Procurement of 107 MW of power on long term basis. For more information please see below link:    

Virtual Public Hearing in the matter of Suo-Moto determination of pre-fixed levelised tariff of solar plants under Component-A of (PM-KUSUM) Scheme

In the matter of: Petition to extend the Control Period for upcoming 10,000 numbers of Grid connected Solar PV Power Plants

  In the matter of: Petition to extend the Control Period of the benchmark capital cost and generic tariff as declared by the Commission vide Order dated 11.05.2020, upto March, 2020 for upcoming 10,000 numbers of Grid connected Solar PV Power Plants of capacity 25 kWp (cumulative capacity of 250 MW) For more information please […]

Virtual Public Hearing in the matter of Suo-Moto determination of pre-fixed levelised tariff of solar plants under Component-A of (PM-KUSUM) Scheme

Determination of additional surcharge in accordance with the provisions of UERC

Determination of additional surcharge in accordance with the provisions of UERC (Terms and Conditions of intra–State Open Access) Regulations, 2015 to meet the fixed cost of UPCL arising out of its obligation to supply electricity to the open access consumers for the period October 2020 to March 2021. For more information please see below link:

Virtual Public Hearing in the matter of Suo-Moto determination of pre-fixed levelised tariff of solar plants under Component-A of (PM-KUSUM) Scheme

Petition seeking increase in ceiling limit of 1 MW applicable to Grid Interactive Rooftop and Small Solar PV Plants to 2 MW

  Petition seeking increase in ceiling limit of 1 MW applicable to Grid Interactive Rooftop and Small Solar PV Plants to 2 MW under RE Regulations, 2018 for net metering arrangement. For more information please see below link: Petition for seeking investment approval on the project for covering the construction of 02 nos. 33/11 kV […]

Virtual Public Hearing in the matter of Suo-Moto determination of pre-fixed levelised tariff of solar plants under Component-A of (PM-KUSUM) Scheme

In the matter of: Approval of the Commission for investment on Under grounding of HT & LT Electrical Networks

In the matter of: Application seeking approval of the Commission for investment on Under grounding of HT & LT Electrical Networks in Haridwar Town under IPDS Program- a flagship program of Ministry of Power under Govt. of India (GoI). For more information please see below link:

Virtual Public Hearing in the matter of Suo-Moto determination of pre-fixed levelised tariff of solar plants under Component-A of (PM-KUSUM) Scheme

In the matter of: Petition for development of 2 MW Solar Project located at Birpur, Dehradun

  In the matter of: Petition for development of 2 MW Solar Project located at Birpur, Dehradun which is under progress and to be connected at 33/11 kV Anarwala (MRS) Dehradun Cantt, Permission for connecting 2 MW Plant output to the 33/11 kV Grid of UPCL at Anarwala may be granted on Net Metering basis […]

Virtual Public Hearing in the matter of Suo-Moto determination of pre-fixed levelised tariff of solar plants under Component-A of (PM-KUSUM) Scheme

Inviting Comments on the draft policies of Uttarakhand Power Corporation

  Inviting Comments on the draft policy for “Capitalization Process and Repair & Maintenance” and policy on “Provisioning and Writing Off of Bad and Doubtful Debts” of Uttarakhand Power Corporation Limited. For more information please see below link: Draft Policies: –

Virtual Public Hearing in the matter of Suo-Moto determination of pre-fixed levelised tariff of solar plants under Component-A of (PM-KUSUM) Scheme

In the matter of: Petition seeking approval of the Commission for advance and return banking of power

In the matter of: Petition seeking approval of the Commission for advance and return banking of power with M/s Arunachal Pradesh Power Corporation Pvt. Ltd., M/s PTC India Ltd., M/s Kreate Energy (I) Pvt. Ltd. and M/s GMR Energy Trading Ltd. under an energy banking arrangement with Uttarakhand Power Corporation Ltd For more information please […]

Virtual Public Hearing in the matter of Suo-Moto determination of pre-fixed levelised tariff of solar plants under Component-A of (PM-KUSUM) Scheme

In the matter of: Determination of additional surcharge in accordance with the provisions of UERC

In the matter of: Determination of additional surcharge in accordance with the provisions of UERC (Terms and Conditions of intra–State Open Access) Regulations, 2015 to meet the fixed cost of UPCL arising out of its obligation to supply electricity to the open access consumers for the period April 2020 to September 2020. For more information […]

Virtual Public Hearing in the matter of Suo-Moto determination of pre-fixed levelised tariff of solar plants under Component-A of (PM-KUSUM) Scheme