True Up of Third Control Period (FY 2014-15 to FY 2018-19) For Himachal Pradesh Power Transmission Corporation Limited (HPPTCL) – EQ Mag
True Up of Third Control Period (FY 2014-15 to FY 2018-19) For Himachal Pradesh Power Transmission Corporation Limited (HPPTCL).
For more information please see below link:


