• HEADLINE
  • India
    India’s Power Demand Surges Early in Summer as Heatwave Drives Record Consumption – EQ
    India
    India Weighs Revisions to Battery Storage Import Benefits Amid Industry Concerns – EQ
    India
    India’s Renewable Energy Expansion Set to Accelerate to 359 GW by FY30 – EQ
    India
    Andhra Pradesh Approves ₹2,500 Crore Cathode Plant in Chittoor to Strengthen EV Battery Ecosystem – EQ
    India
    Andhra Pradesh Speeds Up Rooftop Solar Rollout Under PM Surya Ghar Scheme to Boost Clean Energy Adoption – EQ
  • login
  • Contact Us
  • Privacy Policy
    • Contact Us
    • Privacy Policy
The Leading Solar Magazine In India
  • The Leading Solar Magazine In India
  • Home
  • Magazine
    • Current Issue
    • MAGAZINE SUBSCRIPTION
    • Magazine Archives
  • News
    • Featured
    • India
    • Middle East & Africa
    • Americas
    • Asia – Pacific
    • Business & Finance
    • Europe & UK
    • Tenders
    • Products
    • PV Manufacturing
    • Renewable Energy
    • Solar Balance of Systems
    • Solar Inverters
    • Solar Off Grid & Roof Tops
    • Energy Storage
  • Infographics
  • EQ Solar TV
  • EQ Solar Awards
  • Interviews
  • More
    • Slide Share
    • Quarter Results
    • Events
    • EQ Auctions
    • Policy & Regulation

 

  1. Home
  2. Tenders
  3. PEDA Issue Tender For Supply of 243 grid-connected rooftop systems (5 kW capacity each) at various government schools in Punjab – EQ Mag Pro
PEDA Issue Tender For Supply of 243 grid-connected rooftop systems (5 kW capacity each) at various government schools in Punjab – EQ Mag Pro
Tenders
September 8, 2021 Anand Gupta 0

PEDA Issue Tender For Supply of 243 grid-connected rooftop systems (5 kW capacity each) at various government schools in Punjab – EQ Mag Pro

0
0
  0
0
0
  0   0
more 
PEDA Floated Different capacity of Rooftop Solar PV Power Projects
now viewing

PEDA Issue Tender For Supply of 243 grid-connected rooftop systems (5 kW capacity each) at various government schools in Punjab – EQ Mag Pro

September 8, 2021 Anand Gupta
Growatt – Picture1
now playing

Growatt Smart Energy: Enabling Grid Stability in India’s Solar Growth - EQ

September 8, 2021 Anand Gupta
Juniper Green Energy’s FDRE power plant in Fatehgarh, Barmer, Rajasthan
now playing

Juniper Green Energy Makes History as India's First FDRE Project Enters Commissioning Phase - EQ

September 8, 2021 Anand Gupta
DERC – BUSINESS PLAN REGULATIONS, 2019
now playing

In the matter of the DERC Comprehensive (Code of Conduct) Regulations, 2001 - EQ

September 8, 2021 Anand Gupta
CERC_Central Electricity Regulatory Commission
now playing

In the matter of Approval of the CERC (Conduct of Business) and (Terms and Conditions of Tariff) “Transmission System for connectivity of Essar Power Gujarat Limited” in the Western Region - EQ

September 8, 2021 Anand Gupta
CERC_Central Electricity Regulatory Commission
now playing

Petition of CERC (Connectivity and General Network Access to the Inter-State Transmission System) Regulations for connectivity has been granted of SUCRL - EQ

September 8, 2021 Anand Gupta
SECi
now playing

SECI issue Tender for RfS for assured Peak Supply of 1500 MWh (500 MW x 3 Hrs.) under CfD Mechanism from ISTS-Connected RE Projects (SECI-CfD-I) - EQ

September 8, 2021 Anand Gupta
Military_Engineering_Service_MES
now playing

MES issue Tender for Provn of Solar Power Plant of at Fort William Under GE(FW) Kolkata - EQ

September 8, 2021 Anand Gupta
Transmission out of Border 1
now playing

India’s Power Demand Surges Early in Summer as Heatwave Drives Record Consumption - EQ

September 8, 2021 Anand Gupta
Battery Energy Storage System_BESS 1
now playing

India Weighs Revisions to Battery Storage Import Benefits Amid Industry Concerns - EQ

September 8, 2021 Anand Gupta
Renewable Energy_RE_Solar_BESS_Battery 4
now playing

India’s Renewable Energy Expansion Set to Accelerate to 359 GW by FY30 - EQ

September 8, 2021 Anand Gupta

PEDA Issue Tender For Supply of 243 grid-connected rooftop systems (5 kW capacity each) at various government schools in Punjab.

The Punjab Energy Development Agency (PEDA) has invited bids for the installation and commissioning of 243 grid-connected rooftop solar systems (5 kW capacity each) with an aggregate capacity of 1.215 MW at various government schools and district institutes of education and training (DIETs) in the state.

The last date to submit the bids online is September 20, 2021.

The successful bidder will also have to take care of the maintenance activities of the project for five years.

The scope of work includes the design, manufacture, supply, erection, testing, and commissioning, including the warranty for five years of 243 grid-connected rooftop systems (5 kW capacity each) of aggregate capacity of 1.215 MW at various government schools and DIETs in Punjab. It will also include the rooftop systems’ operation and maintenance, including wear, tear, overhauling, machine breakdown, and replacement of defective modules, invertors, spares, consumables, and other parts for five years.

The last date to submit the bids online is September 20, 2021, and bids will be opened on September 21.

Interested bidders will have to submit an amount of ₹1.2 million (~$16,415) as an earnest money deposit. The successful bidder will have to furnish 10% of the work order value as the performance bank guarantee within 20 days from the date of the issuance of the notification of award.

The allocated work must be completed within 100 days from the date of placement of the work order.

To participate in the bidding process, the bidder should have installed and commissioned rooftop systems of a cumulative capacity of 1 MW in India, out of which 25 systems should be up to 10 kW each for any government agency, state nodal agency, or any public sector enterprise.

Regarding the financial criteria, the bidder’s financial turnover during any one of the last three financial years should be at least ₹60 million (~$820,773). Also, the bidder should have experience of successfully executing three similar works of ₹24 million (~$328,309) each, or two similar works of ₹30 million (~$410,386) each or one similar work of ₹48 million (~$656,618) value.

As per the tender documents, failure to complete the work order in time will attract a penalty at 1% of the delayed goods for every week of delay or part thereof subject to a maximum of 10% value of delayed goods and services, including project commissioning.

The solar modules to be used in the project should be made in India, and they should be from the Approved List of Models and Manufacturers (ALMM) issued by the Ministry of New and Renewable Energy.

The total solar array capacity should not be less than the allocated capacity (kW) and should comprise solar crystalline modules of a minimum of 250 Wp and above wattage. The efficiency of the modules should not be less than 16%.

Related posts:

  1. PEDA Issues Tender For Supply of 5 MW Grid Connected Rooftop Solar Power Plant
  2. Supply of 1500 KW Grid Connected Solar PV Power Plant at ITI ,Rae Bareli
  3. TSECL Issue Tender For Supply of 1.0 MWP Grid Connected Rooftop Solar Power Plants in Different Location For Residential Sector in Tripura – EQ Mag Pro
  4. Extension of Bid Submission Deadline For 5,000 MW Grid Connected Solar Power Projects (TRANCHE‐III) In India Under CPSU Scheme Phase‐II – EQ Mag Pro
tags: grid connected PEDA Punjab Rooftop Solar Systems tender
  0
0
0
  0   0
previous Department of Rural Development and Panchayats Issue Tender SITC of Roof Top 25 KW Solar Power Plant At Ludhiana - EQ Mag Pro
next Department of Local Government Issue Tender For Providing and Fixing 10 KW Grid Solar Plant at M.C Sanour - EQ Mag Pro
Anand Gupta Editor - EQ Int'l Media Network
Related Posts
SECi

SECI issue Tender for RfS for assured Peak Supply of 1500 MWh (500 MW x 3 Hrs.) under CfD Mechanism from ISTS-Connected RE Projects (SECI-CfD-I) – EQ

April 20, 2026 Anand Gupta 0
Military_Engineering_Service_MES

MES issue Tender for Provn of Solar Power Plant of at Fort William Under GE(FW) Kolkata – EQ

April 20, 2026 Anand Gupta 0
Government of Himachal Pradesh_GoHP 2

Himachal Pradesh issue Tender for 9 MW Solar Project with 6.3 MWh Battery Storage – EQ

April 18, 2026 Anand Gupta 0

Interviews

VIKAS-ARYA-CEO-JAKSON-SOLAR[1]

EQ In Exclusive Conversation With Mr. Vikas Arya, Vice President-Product Development & Design – Jakson Solar – EQ

March 25, 2025
Mr. Ashok Kumar Singh, President, Novasys Greenergy Pvt. Ltd 2

EQ In Exclusive Conversation With Mr. Ashok Kumar Singh, President, Novasys Greenergy Pvt. Ltd. – Novasys Perspective On Market, Technology, And Policy Outlook

October 23, 2024
unnamed-removebg-preview

EQ in Exclusive Conversation With Mr. Sunesh Menon – Technical Manager India, Growatt

October 22, 2024
1517705512177

EQ in Exclusive Conversation With Mr. Brinder Gandhi – CEO, Impulse Green Energy – Impulse Green Energy Collab With Sineng Electric

October 22, 2024
Julian Thomas

EQ In Exclusive Conversation With Mr. Julian Thomas Senior Project Director – Renewable Energy & Battery Portfolio – Informa Markets India Pvt Ltd

September 13, 2024

Quarter Results

IREDA to establish office in Gujarat’s GIFT city to finance Renewable Energy projects in foreign currency

IREDA Q3 Results: Net profit zooms 67% to Rs 335 crore – EQ

January 22, 2024
Sterling and Wilson

Sterling and Wilson Renewable Energy loss narrows to Rs 62.39 cr in Dec quarter – EQ

January 19, 2024
SIEMENS

Siemens net profit down 12.4% to Rs 571 crore in September quarter – EQ

November 29, 2023
ReNew logo_12 Feb 2023 (1)

ReNew Q2 profit soars to 675.4 crore, upgrades FY24 EBITDA outlook – EQ

November 21, 2023
Tata Power profit zooms 74% to Rs 465 cr in April-June quarter

Tata Power Q2 net profit up 9% to 1,017 crore – EQ

November 9, 2023

Humans of Solar

FOUR-C-TRON_Logo

Mr.Chandrasekhara- FOUR-C-TRON- Share Solar Journey with EQ

March 18, 2017
0
NCLT notice to Madhya Pradesh discom over dues to Tata Power Renewable Energy Ltd

Mr. Mantha Balasubramaniam – Share Solar Journey with EQ

March 18, 2017
0

Tenders

SECi

SECI issue Tender for RfS for assured Peak Supply of 1500 MWh (500 MW x 3 Hrs.) under CfD Mechanism from ISTS-Connected RE Projects (SECI-CfD-I) – EQ

April 20, 2026
Military_Engineering_Service_MES

MES issue Tender for Provn of Solar Power Plant of at Fort William Under GE(FW) Kolkata – EQ

April 20, 2026
Government of Himachal Pradesh_GoHP 2

Himachal Pradesh issue Tender for 9 MW Solar Project with 6.3 MWh Battery Storage – EQ

April 18, 2026
NTPC Vidyut Vyapar Nigam Ltd. (NVVN) invites online bids from eligible bidders on Single Stage Two Envelope bidding basis for Operation of 100 Nos. of Electric Buses in the state of Goa.

NVVN issue Tender for Development of Grid Connected Roof Top Solar Power Project at Aiims Bathinda – EQ

April 18, 2026
SECi

SECI issue Tender for Selection of Solar Project Developers for setting up of 4.5 MW Grid-Connected Rooftop Solar PV Projects under RESCO mode – EQ

April 17, 2026

EQ Solar TV

Indonesia1

EQ Webinar on Indonesia 2021 Solar Market Outlook & Projects in Pipeline

February 13, 2021
Scada

EQ Webinar on SCADA in RoofTop & Distributed Solar Systems

February 13, 2021
Bangladesh Final Flyer

EQ Webinar on Bangladesh 2021 Solar Market Outlook & Projects in Pipeline

February 13, 2021
Hydrogen new

EQ Webinar on Emerging Hydrogen Economy

February 13, 2021
Malaysianewone

EQ Webinar on Malaysia Net Metering Policies, Rules & Regulations for Distributed / RoofTop Solar

February 13, 2021

About EQ INTERNATIONAL

EQ provides unique Insights & Transparency in Power Generation,Clean Energy, Low Carbon Technologies, Carbon Markets. Latest Industry Information,News, Research & Analysis, Technology & Products Information, Business & Financial News, Policy & Regulation is delivered to an interesting diverse readership base in Energy Corporations, Government, Policy Makers & Regulators,Consultancy & Advisory Firms, Associations, Banking & Financial World

Recent Posts

  • Growatt Smart Energy: Enabling Grid Stability in India’s Solar Growth – EQ
  • Juniper Green Energy Makes History as India’s First FDRE Project Enters Commissioning Phase – EQ
  • In the matter of the DERC Comprehensive (Code of Conduct) Regulations, 2001 – EQ
  • In the matter of Approval of the CERC (Conduct of Business) and (Terms and Conditions of Tariff) “Transmission System for connectivity of Essar Power Gujarat Limited” in the Western Region – EQ
  • Petition of CERC (Connectivity and General Network Access to the Inter-State Transmission System) Regulations for connectivity has been granted of SUCRL – EQ

Search

eqmagpro.com
  • Contact Us
  • Privacy Policy
Close
  • Home
  • Magazine
    • Current Issue
    • MAGAZINE SUBSCRIPTION
    • Magazine Archives
  • News
    • Featured
    • India
    • Middle East & Africa
    • Americas
    • Asia – Pacific
    • Business & Finance
    • Europe & UK
    • Tenders
    • Products
    • PV Manufacturing
    • Renewable Energy
    • Solar Balance of Systems
    • Solar Inverters
    • Solar Off Grid & Roof Tops
    • Energy Storage
  • Infographics
  • EQ Solar TV
  • EQ Solar Awards
  • Interviews
  • More
    • Slide Share
    • Quarter Results
    • Events
    • EQ Auctions
    • Policy & Regulation

REPORT THIS

Error: Contact form not found.

Share this video