Pre-tender meeting: Setting up of Ground Mounted Solar PV Pilot Project under RESCO Mode in Pang, Leh – EQ
Pre-tender meeting: Setting up of Ground Mounted Solar PV Pilot Project under RESCO Mode in Pang, Leh
This is in reference to the NIT dated 08.05.2025 issued by SECI Selection of Developer for setting up of Ground Mounted Solar PV Pilot Project for a cumulative capacity of 500 kW will be carried out through Tariff-based Competitive Bidding Process. The Pilot Project will be located in Pang, Leh.
In this regard, a pre-terder meeting has been scheduled as per the following details:
Date and time of meeting: 27.05.2025 (03:00 PM IST)
Mode of meeting: Online only
Meeting link: https://teams.microsoft.com/l/meetup-join/19%3aXTet8N6xkE_6eHvy05IhHjREk102bgbYd2exX2o-3pU1%40thread.tacv2/1747983729280?context=%7b%22Tid%22%3a%22a24b3e19-3a1f-4c61-9f1e-cace38462ab7%22%2c%22Oid%22%3a%225164b124-35cd-46f3-97d9-6f9cc331e98c%22%7d
Prospective bidders are requested to join the pre-tender meeting as per the above details.
In case of any query, connect with us at abhisekhsri@seci.co.in and swapnil.gandhi@seci.co.in.
Related posts:
- NIT for Setting up of Ground Mounted Solar PV Pilot Project under RESCO Mode in Pang, Leh – EQ
- RfS Setting up of Grid-Connected Floating Solar PV Projects with BESS in Lakshadweep under RESCO Mode – EQ
- RfS for Setting up of 6.25 MW Grid-Connected Rooftop Solar PV Projects under RESCO Mode – EQ
- Balance of System tender for setting up of grid connected 200 MW Ground mounted Solar PV plant at Dhar, Madhya Pradesh – EQ