Featured August 12, 2019 Anand Gupta 0 Bid Submission Date Extended for 25 Mwp Solar Power Plant 0 0 0 00 0 0 more now viewing Bid Submission Date Extended for 25 Mwp Solar Power Plant August 12, 2019 Anand Gupta now playing Guidelines for Installation and Operation of Electric Vehicle Charging Infrastructure-2024 — reg. - EQ August 12, 2019 Anand Gupta now playing State-run NTPC's green energy arm files for $1.2 bln India IPO - EQ August 12, 2019 Anand Gupta now playing PFC Issue Tender for "Transmission system for evacuation of RE power from Raghanesda area of Gujarat – 3 GW under Phase-I" - EQ August 12, 2019 Anand Gupta now playing Jindal India Renewable Energy Forays into Battery Storage Space - EQ August 12, 2019 Anand Gupta now playing AMG, RWE partner for annual green ammonia supply from India - EQ August 12, 2019 Anand Gupta now playing Every individual has a big role to play in climate action, energy must be consumed optimally: Vice-president Shri Jagdeep Dhankar - EQ August 12, 2019 Anand Gupta now playing Sunsure Energy partners with REC for green energy projects - EQ August 12, 2019 Anand Gupta now playing Petition for approval of levelized tariff discovered through transparent competitive bidding carried out by JdVVNL for solar power projects under Component-C (Feeder Level Solarization) of Pm- Kusum Scheme - EQ August 12, 2019 Anand Gupta now playing Petition for approval of levelized tariff discovered through transparent competitive bidding carried out by JVVNL for solar power projects with aggregate capacity of 208.91 MW under Component-C - EQ August 12, 2019 Anand Gupta now playing Union Environment Minister Sh. Bhupender Yadav Addresses Plenary Session on India's Pathway to Net-Zero Emissions in Re-Invest Summit 2024 - EQ August 12, 2019 Anand Gupta Bid Submission Date Extended for 25 Mwp Solar Power Plant For more information please see below link: Related posts: UPNEDA Issues Tender to Install 2,100 Solar Streetlights, 800 Solar High Mast & 21,000 Solar Power Pack System Uttar Pradesh UPNEDA – List of Technically Qualified Bidders SJVN Bags 75 MW Grid-Connected Solar Project in Uttar Pradesh NSEFI Letter to Minister: UPNEDA Auction cancellation issue tags: UPNEDA 0 00 0 0 previous Solar-powered warehouses have boosted Japanese interest in Bengal: Ambassador next One year after safeguard duty was imposed, results have been disappointing Anand Gupta Editor - EQ Int'l Media Network Related Posts Guidelines for Installation and Operation of Electric Vehicle Charging Infrastructure-2024 — reg. – EQ September 19, 2024 Anand Gupta 0 Every individual has a big role to play in climate action, energy must be consumed optimally: Vice-president Shri Jagdeep Dhankar – EQ September 19, 2024 Anand Gupta 0 Union Environment Minister Sh. Bhupender Yadav Addresses Plenary Session on India’s Pathway to Net-Zero Emissions in Re-Invest Summit 2024 – EQ September 19, 2024 Anand Gupta 0 LEAVE YOUR COMMENT Cancel replyYour email address will not be published. Required fields are marked *