Featured August 13, 2020 Anand Gupta 0 Breaking News – GUVNL 700MW eRA 0 0 0 00 0 0 more now viewing Breaking News – GUVNL 700MW eRA August 13, 2020 Anand Gupta now playing National Workshop on RE integration through ESS Phase-II to be held on 30.04.2026 in hybrid mode – reg. - EQ August 13, 2020 Anand Gupta now playing Petition of the CERC (Terms and Conditions for Renewable Energy Certificates for Renewable Energy Generation) Regulations - EQ August 13, 2020 Anand Gupta now playing Petition for Adoption of tariff for 1200 MW Inter-State Transmission System connected Solar PV Power Projects with ESS (SECI-ISTS-XXI) - EQ August 13, 2020 Anand Gupta now playing Draft CERC (Power Market) (Second Amendment) Regulations, 2026 - EQ August 13, 2020 Anand Gupta now playing MES issue Tender for R&R of High Mast Light, Solar Street Lights, Security Lights, Perimeter Lights and Connected Works at Domestic Area of AFs Yelahanka - EQ August 13, 2020 Anand Gupta now playing CEL issue Tender for EOI for empanelment of EPC contractors for awarding the work related to Solar PV Systems - EQ August 13, 2020 Anand Gupta now playing Rooftop Solar Revolution Lights Up Western Odisha as 11,000 Consumers Achieve Zero Electricity Bills - EQ August 13, 2020 Anand Gupta now playing India Engages Nepal’s New Government to Deepen Bilateral Energy Cooperation - EQ August 13, 2020 Anand Gupta now playing Clean Energy at the Core: Goa CM Sawant Highlights Sustainable Path for India’s Growth - EQ August 13, 2020 Anand Gupta now playing Rajasthan Achieves 4,000 MW Solar Milestone Under PM-KUSUM, Boosting Rural Energy Transformation - EQ August 13, 2020 Anand Gupta Breaking News – GUVNL 700MW eRA Related posts: Gujarat GUVNL 1GW Wind Tender eRA results GSECL received LoA from GUVNL for establishing 100MW grid connected Solar Photo Voltaic Power Project at Ultra Mega Solar Park at Raghanesda GUVNL Floats NIT For 500 MW Grid Connected Solar PV Projects List of GUVNL*500 MW (Phase XII) Bidders tags: 700MW eRA BREAKING NEWS GUVNL 0 00 0 0 previous Time Extension in Scheduled Commissioning Date of RE Projects next Climate risk and response in Asia: Research preview Anand Gupta Editor - EQ Int'l Media Network Related Posts National Workshop on RE integration through ESS Phase-II to be held on 30.04.2026 in hybrid mode – reg. – EQ April 27, 2026 Anand Gupta 0 Energy Storage in the Desert Furnace: Hopewind’s Liquid-Cooled Central PCS Proves 51°C Rating Is a Business Imperative for India – EQ April 27, 2026 Anand Gupta 0 COP31 Co-Hosts Emphasize Renewables as Critical Shield Against Fossil Fuel Price Shocks – EQ April 27, 2026 Anand Gupta 0