1. Home
  2. Featured
  3. Design Fabrication Supply Installation Testing And Commissioning Of 18 Kwp SOLAR POWER PLANT At TIFR Colaba Mumbai
Design Fabrication Supply Installation Testing And Commissioning Of 18 Kwp SOLAR POWER PLANT At TIFR Colaba Mumbai

Design Fabrication Supply Installation Testing And Commissioning Of 18 Kwp SOLAR POWER PLANT At TIFR Colaba Mumbai

24
0

Design Fabrication Supply Installation Testing And Commissioning Of 18 Kwp SOLAR POWER PLANT At TIFR Colaba Mumbai 400 005 As Per Attached Tender Documents

Tender Value in Rs. : 18,00,000

For more information please see below link:

 

Anand Gupta Editor - EQ Int'l Media Network

LEAVE YOUR COMMENT

Your email address will not be published. Required fields are marked *