Engineering Procurement Construction EPC and 1 Year Free Comprehensive Operation and Maintenance O andM of 100 kWp Hybrid Ground Mounted Captive Solar Power Project at IndianOil LPG Bottling Plant 15 km Milestone Phyang Dist Leh J and K with its furt
75
0
Engineering Procurement Construction EPC and 1 Year Free Comprehensive Operation and Maintenance O andM of 100 kWp Hybrid Ground Mounted Captive Solar Power Project at IndianOil LPG Bottling Plant 15 km Milestone Phyang Dist Leh J and K with its furt
For more information please see below link…
Related posts:
- Purchase of 120 Nos of batteries for the 25 KW Solar Power System for Nimoo Bazgo Power Station
- R.M.O. Water Purifier and S.W.H.S. system installed at the R/o HMPs Flats under South Avenue, New Delhi. SH : Repairing of Solar Water Heating System under South Avenue.
- Provn of roof Top Solar Panels at Dehradun
- Supply and Installation of Solar Power Plant