Featured May 26, 2023 Anand Gupta 0 Extension of Bid submission Deadline: Tender fo Supply (except PV Modules) of 300 MW (AC) Ground Mounted Solar PV Project at Ramagiri, Andhra Pradesh having 5 years Plant O&M – EQ Mag 0 00 0 0 more Extension of Bid submission Deadline: Tender fo Supply (except PV Modules) of 300 MW (AC) Ground Mounted Solar PV Project at Ramagiri, Andhra Pradesh having 5 years Plant O&M – EQ Mag May 26, 2023 Anand Gupta now playing Against All Odds: How Lumencity Made the Delhi Vidhan Sabha Net-Zero - EQ May 26, 2023 Anand Gupta now playing Hoymiles Unveils Next-Generation Energy Storage Solutions at StorageNext 2026 in New Delhi - EQ May 26, 2023 Anand Gupta now playing Gautam Solar Reports ₹4406 Cr Revenue in FY26, Achieves Over 4X Growth - EQ May 26, 2023 Anand Gupta now playing CAQM’s 28th Full Commission Meeting reviews Key agenda items pertaining to Prevention and Control of Air Pollution in Delhi-NCR - EQ May 26, 2023 Anand Gupta now playing Renewable Energy Growth Slows Emissions Rise in 2025, Says IEA - EQ May 26, 2023 Anand Gupta now playing NTPC Ltd issue Tender for Supply of Solar PV Modules for 1.2 GW Solar PV Projects at NTPC Rel Khavda RE Park-South Block in Rann of Kutch Gujarat - EQ May 26, 2023 Anand Gupta now playing NTPC Ltd issue Tender for Supply and Installation of SVG Package for Reactive Power Compensation at Devikot Solar PV Station - EQ May 26, 2023 Anand Gupta now playing CPWD issue Tender for SITC of Grid Connected Rooftop Solar Power Plant at Composite Regional Centre (CRC) Rajnandgaon (C.G.) - EQ May 26, 2023 Anand Gupta now playing How governments can best support consumers during this energy crisis - EQ May 26, 2023 Anand Gupta now playing Avaada Group Surpasses 17.7 GWp Renewable Portfolio; Over 7.2 GWp Operational and ~ 10.5 GWp Under Construction - EQ May 26, 2023 Anand Gupta Extension of Bid submission Deadline: Tender for Design, Engineering, Supply (except PV Modules), Construction, Erection, Testing & Commissioning of 300 MW (AC) Ground Mounted Solar PV Project at Ramagiri, Andhra Pradesh having 5 years Plant O&M under CPSU Scheme Phase II, Tranche III. Owner: Solar Energy Corporation of India Limited (SECI), New Delhi, India Tender No: SECI/C&P/OP/11/0006/2022-23 ETS ID: SECI-2023-TN000009 CPPP Tender ID: 2023_SECI_707482_1 Extension of Bid submission Deadline: Existing Date & Time of Bid Submission: 26.05.2023 till 1400 HRS Existing Date & Time of Bid Opening: 26.05.2023 at 1600 HRS Revised Date & Time of Bid Submission: 26.06.2023 till 1400 HRS Revised Date & Time of Bid Opening: 26.06.2023 at 1600 HRS Prospective Bidders are requested to remain updated for any notices w.r.t. the Bidding documents through the websites www.seci.co.in as no separate notification will be issued in this regard. tags: 300 MW Extension of Bid submission Deadline SECI tender 00 0 0 previous Zhejiang Thermal Power and Longi Solar ink the module supply for KomOmbo 200 MWac Project in Egypt - EQ Mag next Extension II of Bid submission Deadline: RfB for Supply of 100 MW (AC) Floating Solar PV Project having 10 years plant O&M at Getalsud Dam, Ranchi, Jharkhand, India - EQ Mag Anand Gupta Editor - EQ Int'l Media Network Related Posts Against All Odds: How Lumencity Made the Delhi Vidhan Sabha Net-Zero – EQ May 16, 2026 Anand Gupta 0 Hoymiles Unveils Next-Generation Energy Storage Solutions at StorageNext 2026 in New Delhi – EQ May 16, 2026 Anand Gupta 0 Gautam Solar Reports ₹4406 Cr Revenue in FY26, Achieves Over 4X Growth – EQ May 16, 2026 Anand Gupta 0