Featured January 10, 2019 Anand Gupta 0 ISTS-connected Solar PV Projects-ISTS-III 79 0 79 00 0 0 more now viewing ISTS-connected Solar PV Projects-ISTS-III January 10, 2019 Anand Gupta now playing Press Note Electricity Tariff for 2023-24 - EQ Mag January 10, 2019 Anand Gupta now playing GERC Tariff Orders for Truing up for FY 2021-22 and Determination of Tariff for FY 2023-24 - EQ Mag January 10, 2019 Anand Gupta now playing Case of The Tata Power Company Limited (Generation) for approval of final true-up of ARR for FY 2019-20, FY 2020-21 and FY 2021-22, provisional true-up of ARR for FY 2022-23, and revised ARR and Tariff for FY 2023- 24 and FY 2024-25 January 10, 2019 Anand Gupta now playing Application for grant of inter-State trading licence Renesys Solar Private Limited - EQ Mag January 10, 2019 Anand Gupta now playing Petition for approval of tariff of Faridabad Gas Based Power Station (431.59 MW), for the period 2019-24. NTPC Limited - EQ Mag January 10, 2019 Anand Gupta now playing Petition of PPA for the development of 300 MW ISTS connected Wind-Solar Hybrid power project entered between Adani Hybrid Energy Jaisalmer Three Limited and SECI - EQ Mag January 10, 2019 Anand Gupta now playing Petition for approval of introduction of High Price Day Ahead Market on PXIL’s PRATYAY Platform - EQ Mag January 10, 2019 Anand Gupta now playing Petition for approval of introduction of the single sided reverse auction and single sided forward auction for renewable energy certificates at PXIL - EQ Mag January 10, 2019 Anand Gupta now playing Petition for approval of tariff of Kameng Hydroelectric Power Plant (KaHEP) (600 MW) NEEPCO - EQ Mag January 10, 2019 Anand Gupta now playing EU reaches provisional deal to raise renewable energy target - EQ Mag January 10, 2019 Anand Gupta ISTS-connected Solar PV Projects-ISTS-III For more information please see below link: Related posts: Year-End Review – Ministry of Power Launch of meteocontrol Chile Rays Power Infra completes the installation of 620MW of solar power capacity in India Letter on Rebate to DISCOMS by Cenrtal Generation and Transmission Companies of MOP tags: ISTS-connected Solar PV Projects-ISTS-III 79 00 0 0 previous Connectivity Regulations (7th Amendment) next Guj Govt eyes 2.20 lakh crore investment in renewable energy Anand Gupta Editor - EQ Int'l Media Network Related Posts ‘Green Hydrogen – Accelerating Net-Zero Pathways’ an event being conducted on the sidelines of the Energy Transition Working Group G20 meeting, Gandhinagar, Gujarat – EQ Mag April 1, 2023 Anand Gupta 0 Bid Documents for selection of TSP for establishing transmission system for “Transmission system for evacuation of power from Rajasthan REZ Ph-IV (Part- 1) (Bikaner Complex): PART-D” April 1, 2023 Anand Gupta 0 Bid Documents for selection of TSP for establishing transmission system for “Transmission system for evacuation of power from Rajasthan REZ Ph-IV (Part- 1) (Bikaner Complex): PART-C” – EQ Mag April 1, 2023 Anand Gupta 0 LEAVE YOUR COMMENT Cancel replyYour email address will not be published. Required fields are marked *