
Petition for Adoption of Tariff discovered through Competitive Bidding Process for procurement of power from the 1200 MW ISTS-Connected Wind-Solar Hybrid Power Projects – EQ
0
0
Petition for Adoption of Tariff discovered through Competitive Bidding Process for procurement of power from the 1200 MW ISTS-Connected Wind-Solar Hybrid Power Projects
For more information please see below link:
Related posts:
- Petition for Adoption of tariff of 1000 MW Wind-Solar Hybrid Power Projects connected to the inter-State Transmission System – EQ
- Petition for Adoption of Tariff 1200 MW Firm & Despatchable Power with “Greenshoe Option” from ISTS connected RE Power Projects coupled with Energy Storage System – EQ
- Petition for Adoption of Tariff Process for Setting up of 1200 MW ISTS-connected Solar PV Power Projects – EQ
- Petition for Adoption of Tariff discovered through Competitive Bidding Process for procurement of power from the 760 MW Firm from ISTS-Connected Renewable Energy Power Projects – EQ
tags:
1200 MW ADOPTION CERC COMPETITIVE BIDDING hybrid power projects ISTS-CONNECTED procurement of power REGULATIONS tariff discovered Wind-solar