1. Home
  2. Policy & Regulation
  3. Petition for Adoption of Tariff for procurement of power from the 760 MW Firm and Dispatchable Power (Assured Peak Power Supply) from ISTS-Connected Renewable Energy Power Projects – EQ
Petition for Adoption of Tariff for procurement of power from the 760 MW Firm and Dispatchable Power (Assured Peak Power Supply) from ISTS-Connected Renewable Energy Power Projects – EQ

Petition for Adoption of Tariff for procurement of power from the 760 MW Firm and Dispatchable Power (Assured Peak Power Supply) from ISTS-Connected Renewable Energy Power Projects – EQ

0
0
Anand Gupta Editor - EQ Int'l Media Network