Petition for Adoption of Tariff for setting up of 1200 MW ISTS-Connected Wind-Solar Hybrid Power Projects (HYBRID-3) – EQ
Summary:
—
## **Case Summary – SJVN Tariff Adoption (Hybrid-3 Project)**
**Forum:** Central Electricity Regulatory Commission (CERC), New Delhi
**Petition No.:** 684/AT/2025
**Date of Hearing:** 12 August 2025
**Coram:**
* Jishnu Barua, Chairperson
* Ramesh Babu V., Member
* Harish Dudani, Member
* Ravinder Singh Dhillon, Member
—
### **1. Case Background**
* **Petitioner:** SJVN Limited
* **Respondents:** M/s Adyant Enersol Pvt. Ltd. (AEPL) & others
* **Subject:**
* Petition under Section 63 of EA 2003 for **adoption of tariff** discovered through **Tariff Based Competitive Bidding (TBCB)**.
* Project: **1200 MW ISTS-connected Wind–Solar Hybrid Projects (HYBRID-3)** across India.
* Bidding conducted under **MoP guidelines dated 21.08.2023** (with amendments).
—
### **2. Proceedings**
* **SJVN’s Counsel:** Confirmed petition filed for adoption of tariff discovered in HYBRID-3 bidding; sought admission.
* **Respondent AEPL:** Stated no objection to adoption of tariff.
—
### **3. Commission’s Directions**
* Petition **admitted**.
* Notice issued to all Respondents.
* **Respondents:** File replies within **2 weeks** (copy to Petitioner).
* **Petitioner (SJVN):** May file rejoinder within **1 week** thereafter.
* **Next Hearing:** 18 September 2025.
—
### **4. Outcome**
* **Type of Order:** Procedural (Record of Proceedings).
* **Effect:** Petition admitted; replies/rejoinders awaited.
* **Status:** To be taken up on 18.09.2025 for further hearing.
—
For more information please see below link:
Related posts:
- Petition for Adoption of Tariff discovered through Competitive Bidding Process for procurement of power from the 1200 MW ISTS-Connected Wind-Solar Hybrid Power Projects – EQ
- Petition for Adoption of Tariff discovered through for procurement of power from the 1200MW ISTS- Connected Wind-Solar Hybrid Power Projects, Ministry of Power, Government of India – EQ
- Petition for Adoption of Tariff discovered for procurement of power from the 1200 MW ISTS-Connected Wind- Solar Hybrid Power Projects – EQ
- Petition for Adoption of Tariff for Setting up of 600 MW ISTS connected Wind Power Projects (Wind-2) in India – EQ