Petition- For Adoption of Tariff for the 480 MW Wind Power Projects (Tranche-VII) connected to the Inter-State Transmission System
Petition under Section 63 of the Electricity Act, 2003 for Adoption of Tariff for the 480 MW Wind Power Projects (Tranche-VII) connected to the Inter-State Transmission System and selected through Competitive Bidding Process as per the Guidelines issued by Ministry of Power on 8.12.2017
For more information please see below link:



