Petition for seeking extension/ deferment of Scheduled Commissioning Date for 45.6 MW out of the total 240 MW wind power project on account of Force Majeure events – EQ Mag Pro
0
0
Petition for seeking extension/ deferment of Scheduled Commissioning Date for 45.6 MW out of the total 240 MW wind power project on account of Force Majeure events.
For more information please see below link:
Related posts:
- Petition of PPA For inter alia seeking extension/ deferment of Scheduled Commissioning Date for 45.6 MW out of the total 250 MW wind power project – EQ Mag Pro
- Petition for adoption of tariff for the 1110 MW Wind-Solar Hybrid Power Projects (Tranche-III) connected to the ISTS and selected through Competitive Bidding Process as per the Guidelines of MNRE, Government of India – EQ Mag Pro
- Petition for adoption of tariff for 8800 MW Solar Power Plants connected to ISTS linked with setting up of 2200 MW Solar Manufacturing Plant – EQ Mag Pro
- Petition for adoption of tariff for 8800 MW Solar Power Plant connected to ISTS linked with Setting-up of Solar Manufacturing Plant – EQ Mag Pro