Petition of 10 MW Solar Photo Voltaic Power Project at KTPS, Koderma, Jharkhand – EQ
Summary:
—
#### 1. Case Overview
– **Forum:** Central Electricity Regulatory Commission (CERC), New Delhi.
– **Petition No.:** 7/RP/2025
– **Type:** Review Petition.
– **Petitioner:** Damodar Valley Corporation (DVC).
– **Respondents:** West Bengal State Electricity Distribution Company Limited (WBSEDCL) and Another.
– **Subject Matter:** Seeking a review of the Commission’s order dated **23.03.2025** in Petition No. **346/GT/2023**.
– **Underlying Project:** 10 MW Solar Photo Voltaic Power Project at Koderma Thermal Power Station, Koderma, Jharkhand.
#### 2. Hearing Details
– **Date of Hearing:** 18 February 2026.
– **Purpose of Hearing:** Admission of the Review Petition.
– **Mode:** Virtual hearing.
– **Coram (Bench):**
– Shri Jishnu Barua (Chairperson)
– Shri Ramesh Babu V. (Member)
– Shri Harish Dudani (Member)
– **Representation:** Shri Venkatesh, Advocate, appeared for DVC (Petitioner).
#### 3. Outcome of the Proceedings (Orders Passed)
The Commission, after hearing the arguments on admission, passed the following orders:
– **Admission:** The Review Petition was formally **admitted**.
– **Notice Issued:** Notice was ordered to be issued to the Respondents (WBSEDCL and Another).
– **Filing Schedule (Strict Timelines):**
– **Replies by Respondents:** Must be filed on or before **24 March 2026**.
– **Rejoinder by Petitioner (DVC):** If any, must be filed by **14 April 2026**.
– **Service of Copies:** Respondents must serve a copy of their replies to the Petitioner.
– **Next Hearing Date:** The petition has been listed for the next hearing on **23 April 2026**.
—-
For more information please see below link:
Related posts:
- Petition of the CERC (Indian Electricity Grid Code) Regulations of Wind Turbine Generators (WTGS) in tranches of at least 10 MW – EQ
- Petition for Adoption of tariff for 100 MW Solar PV Power Project (Tranche- VIII) connected to the ISTS of the Government of India – EQ
- Draft Central Electricity Regulatory Commission (Procedure, Terms and Conditions for grant of Transmission Licence and other related matters) Regulations, 2023 – EQ
- Draft Central Electricity Regulatory Commission (Deviation Settlement Mechanism and Related Matters) Regulations, 2024 – EQ