Petition of CERC (Connectivity and General Network Access) Regulations for renewable energy source change with respect to Connectivity – EQ
0
0
Petition of CERC (Connectivity and General Network Access) Regulations for renewable energy source change with respect to Connectivity
For more information please see below link:
Related posts:
- Petition of the CERC (Connectivity and General Network Access to Inter-State Transmission System) Regulations of ‘Power to Relax’ and ‘Power to Remove Difficulty’ – EQ
- Petition of the CERC (Connectivity and General Network Access to the inter-State Transmission System) Regulations issued by Central Transmission Utility of India Limited to ReNew Green Energy – EQ
- Petition of the CERC (Connectivity and General Network Access to the inter-State Transmission System) Regulations against revocation of connectivity – EQ
- Petition of the CERC (Connectivity and General Network Access to the inter-State Transmission System) Regulations, 2022 – EQ


