
Petition of the CERC (Connectivity and General Network Access to the inter-State Transmission System) Regulations against revocation of connectivity – EQ
0
0
Petition of the CERC (Connectivity and General Network Access to the inter-State Transmission System) Regulations against revocation of connectivity
For more information please see below link:
Related posts:
- Petition with the CERC (Connectivity and General Network access to the Inter- State Transmission System) Regulations, 2022 – EQ
- Petition of the CERC (Connectivity and General Network Access to the inter-State Transmission System) Regulations against revocation of connectivity – EQ
- Petition of the CERC (Connectivity and General Network Access to the inter- State Transmission System) and (Grant of Connectivity, Long- Term Access and Medium-term Open Access in Inter-State Transmission and Related Matters) Regulations – EQ
- Petition of the CERC (Connectivity and General Network Access) and (Conduct of Business) Regulations, to permit the inter-se utilisation and transfer of Connectivity – EQ
tags:
CERC CONNECTIVITY General Network Access REGULATIONS revocation of connectivity the Inter- State Transmission System