Petition of tariff for 970 MW Wind Power Projects (Tranche-IX) connected through inter-State Transmission System – EQ Mag Pro
Petition of tariff for 970 MW Wind Power Projects (Tranche-IX) connected through inter-State Transmission System.
For more information please see below link:





