
Petition of the CERC (Connectivity and General Network Access to the inter-State Transmission System) Regulations to Betam Wind Energy Private Limited – EQ
0
0
Petition of the CERC (Connectivity and General Network Access to the inter-State Transmission System) Regulations to Betam Wind Energy Private Limited
For more information please see below link:
Related posts:
- Petition of CERC (Connectivity and General Network Access to the Inter-State Transmission System) Regulations, 2022 – EQ
- Draft of CERC (Connectivity and General Network Access to the inter-State Transmission System) (Fourth Amendment) Regulations, 2025 – EQ
- Petition of the CERC (Connectivity and General Network Access to the inter- State Transmission System) and (Grant of Connectivity, Long- Term Access and Medium-term Open Access in Inter-State Transmission and Related Matters) Regulations – EQ
- Petition of the CERC (Connectivity and General Network Access to the Inter-State Transmission System) and (Conduct of Business) Regulations – EQ
tags:
Betam Wind Energy Private Limited CERC CONNECTIVITY General Network Access inter state transmission system REGULATIONS