
Petition of the CERC (Terms and Condition of Tariff) Regulations for determination of tariff for installation of various Emission Control Systems in KTPS Units – EQ
0
0
Petition of the CERC (Terms and Condition of Tariff) Regulations for determination of tariff for installation of various Emission Control Systems in KTPS Units
For more information please see below link:
Related posts:
- Petition of the CERC (Terms and Condition of Tariff) Regulations for installation of various Emission Control Systems in Bokaro-A Thermal Power Station (1×500 MW) – EQ
- Petition of the CERC (Terms and Condition of Tariff) Regulations, 2019 for installation of various Emission Control Systems in RTPS (2×600 MW) – EQ
- Petition of the CERC (Terms and Condition of Tariff) Regulations, 2019 for installation of various Emission Control Systems in KTPS Units 1&2 (2 X 500 MW) of DVC – EQ
- Petition of the Electricity Act executed between RKM Powergen Private limited and the Uttar Pradesh Power Corporation Limited to installation of FGD system and as a change in law event of the PPA – EQ