Petition of the CERC (Connectivity and General Network Access to the Inter-State Transmission System) and (Conduct of Business) Regulations to 2×300 MW connectivity at Kurnool – III – EQ
Petition of the CERC (Connectivity and General Network Access to the Inter-State Transmission System) and (Conduct of Business) Regulations to 2×300 MW connectivity at Kurnool – III
For more information please see below link:
tags:
2x300 MW ACCESS CERC Conduct of Business CONNECTIVITY Connectivity and General Network General Network inter state transmission system REGULATIONS


