1. Home
  2. Featured
  3. SECI ISSUES NIT FOR SETTING UP OF 14 MW SOLAR POWER PLANT WITH 42MWH BESS (7MW/21MWH EACH AT LEH AND KARGIL DIVISIONS)
SECI ISSUES NIT FOR SETTING UP OF 14 MW SOLAR POWER PLANT WITH 42MWH BESS (7MW/21MWH EACH AT LEH AND KARGIL DIVISIONS)

SECI ISSUES NIT FOR SETTING UP OF 14 MW SOLAR POWER PLANT WITH 42MWH BESS (7MW/21MWH EACH AT LEH AND KARGIL DIVISIONS)

29
0

The detailed Request for Selection Documents will be available on March 15, 2019.

Solar Energy Corporation of India Ltd. (SECI) invites online bids for Setting up of Setting up of 14MW Solar Power Plant With 42MWh BESS (7MW/21MWh each At Leh and Kargil Divisions).

The detailed Request for Selection Document (RfS) shall be available for downloading latest by 15.03.2019 onwards on www.tcil-india-electronictender.com. Prospective bidders are requested to remain updated for any notices/amendments/clarifications etc. to the RfS document through the websites www.seci.co.in and www.tcil-india-electronictender.com as no separate notification will be issued.

For any query related to this tender, bidders may reach us over ph.no: 011-71989264 or mail us on contracts@seci.co.in

Tender Rights: SECI reserves the right to reject any or all tenders in part or full without assigning any reason whatsoever and without thereby any liability.

Source: seci.co.in
Anand Gupta Editor - EQ Int'l Media Network

LEAVE YOUR COMMENT

Your email address will not be published. Required fields are marked *