
Shifting of 33kV Overhead Line for installation of Solar Panels at Balaghat Mine.
47
0
Shifting of 33kV Overhead Line for installation of Solar Panels at Balaghat Mine.
For more information please see below link:
Related posts:
- RUMS :Invitation to bid for construction of 33/220 KV pooling substation with associated transmission lines of 250 MW Grid-Connected Solar Photovoltaic Project at Suwasra
- Drilling of Borewell and Contruction of Dual Pump (Solar) Based Mini Water Supply Scheme on that borewell At Ghadi padavewadi.
- SUPPLY AND INSTALLATION OF 5 KW SOLAR POWER PLANT AT VILLAGE RANIPUR, SAHARSAVAAN BLOCK FOR D.R.D.A. KAUSHAMBI U.P.
- Supplying of solar home light kits in Hebbagodi CMC Limits