1. Home
  2. Tag "Chennai"

CPWD issue Tender for SITC of Solar PV plant at NSTI AdBuilding Balance portion of Terrace Guindy Chennai – EQ

CPWD issue Tender for SITC of Solar PV plant at NSTI AdBuilding Balance portion of Terrace Guindy Chennai For more information please see below link: Tender Details : Tender Title : 79/EE E-CHENNAI-II /2025-2026/CPWD/CHENNAI Tender Reference Number : 79/EE E-CHENNAI-II /2025-2026/CPWD/CHENNAI Tender Type : Open/Advertised Tender Category : Works Product Category : Electrical Works Product […]

NTPC Ltd EPC issue Tender for Package for Development of 100 MW Solar with 50MW/200MWh BESS Project at Jhansi, U.P 17-4NTPC Ltd EPC Package for Development of 100 MW Solar with 50MW/200MWh BESS Project at Jhansi, U.P – EQ

Green Manufacturing: A Strategic Business Imperative in Chennai – EQ

In Short : Chennai is witnessing a growing emphasis on green manufacturing as companies adopt sustainable practices to enhance efficiency, reduce emissions, and meet regulatory requirements. Businesses in the city are integrating clean technologies, circular economy principles, and renewable energy into operations, positioning sustainability as a critical driver of competitiveness, cost savings, and long-term resilience […]

Gujarat Emerges as a Key Player in India’s Battery Storage Revolution – EQ

CPWD issue Tender for SITC of Rooftop solar system at NIEPMD Campus, Chennai – EQ

CPWD issue Tender for SITC of Rooftop solar system at NIEPMD Campus, Chennai For more information please see below link: Tender Details : Tender Title : 53/CE/EE(E)/CHENNAI-I/2025-26/CPWD/CHN/2ND RECALL Tender Reference Number : 53/CE/EE(E)/CHENNAI-I/2025-26/CPWD/CHN/2ND RECALL Tender Type : Open/Advertised Tender Category : Works Product Category : Multi-crop Thresher Product Sub-Category : Tender Fee * : 0 EMD * […]

NTPC Ltd EPC issue Tender for Package for Development of 100 MW Solar with 50MW/200MWh BESS Project at Jhansi, U.P 17-4NTPC Ltd EPC Package for Development of 100 MW Solar with 50MW/200MWh BESS Project at Jhansi, U.P – EQ

CPWD issue Tender for SITC of roof top solar system with capacity in the IMU Chennai and VOC Hostel, campus Uthandi Chennai – EQ

CPWD issue Tender for SITC of roof top solar system with capacity in the IMU Chennai and VOC Hostel, campus Uthandi Chennai For more information please see below link: Tender Details : Tender Title : 54/CE/EE(E)/CHENNAI-1/2025-26/CPWD/CHN/RECALL Tender Reference Number : 54/CE/EE(E)/CHENNAI-1/2025-26/CPWD/CHN/RECALL Tender Type : Open/Advertised Tender Category : Works Product Category : Multi-crop Thresher Product […]

NTPC Ltd EPC issue Tender for Package for Development of 100 MW Solar with 50MW/200MWh BESS Project at Jhansi, U.P 17-4NTPC Ltd EPC Package for Development of 100 MW Solar with 50MW/200MWh BESS Project at Jhansi, U.P – EQ

Snapshot after e-RA for Project-III: Madras Fertilizers Limited, Chennai (4,000 MT) – EQ

Summary: — ## 📌 Case Overview * **Project:** Production & Supply of **Green Ammonia** under SIGHT Scheme (Mode-2A, Tranche-I). * **Entity:** **Madras Fertilizers Limited (MFL), Chennai**. * **Capacity:** **4,000 MT**. * **Date of e-RA (Electronic Reverse Auction):** **29th August 2025**. * **RfS Reference:** SECI/C\&P/MI/00/0002/2024-25 dated 07.06.2024. * **Conducted by:** Solar Energy Corporation of India (SECI). […]

Petition of CERC (Connectivity and General Network Access to the Inter-State Transmission System) Regulations of the land required for grant of final connectivity – EQ

Tidel Park Ltd issue Tender for PML for IT Park at Chennai, 10 MW Solar Plant Accessories at Mariyur Village and 1.25 MW Windmill Accessories at Tirunelveli – EQ

Summary: — ## **TIDEL Park Limited** **Document Type:** Tender Notice **Issued by:** TIDEL Park Limited, Tamil Nadu **Date:** 23.07.2025 — ### **1. Key Dates** * **Tender Publication Date:** 23.07.2025 * **Bid Submission Deadline:** As per tender document (exact date not specified in the notice extract) * **Opening of Technical Bids:** As per schedule in tender […]

NTPC Ltd EPC issue Tender for Package for Development of 100 MW Solar with 50MW/200MWh BESS Project at Jhansi, U.P 17-4NTPC Ltd EPC Package for Development of 100 MW Solar with 50MW/200MWh BESS Project at Jhansi, U.P – EQ

CPWD issue Tender for SITC of Rooftop solar System with capacity at NIEPMD Campus Chennai – EQ

CPWD issue Tender for SITC of Rooftop solar System with capacity at NIEPMD Campus Chennai For more information please see below link: Tender Details : Tender Title : 53/CE/EE(E)/CHENNAI-I/2025-26/CPWD/CHN/RECALL Tender Reference Number : 53/CE/EE(E)/CHENNAI-I/2025-26/CPWD/CHN/RECALL Tender Type : Open/Advertised Tender Category : Works Product Category : Multi-crop Thresher Product Sub-Category : Tender Fee * : 0 EMD * […]

NTPC Ltd EPC issue Tender for Package for Development of 100 MW Solar with 50MW/200MWh BESS Project at Jhansi, U.P 17-4NTPC Ltd EPC Package for Development of 100 MW Solar with 50MW/200MWh BESS Project at Jhansi, U.P – EQ

Hoymiles and Redington Solar Host Successful Solar Professionals Meet in Chennai, Strengthening Industry Collaboration – EQ

Chennai – Hoymiles, a global leader in SolarTechnology, in collaboration with Redington Solar, successfully hosted the Solar Professionals Meet in Chennai, India. The event brought together a large gathering of solar industry stakeholders for an insightful evening of knowledge exchange, engaging discussions, and a vibrant gala dinner. The event witnessed a remarkable turnout, underscoring the […]

Petition of CERC (Connectivity and General Network Access to the Inter-State Transmission System) Regulations of the land required for grant of final connectivity – EQ

Exciting news: WattPower inaugurates a cutting-edge solar PV factory in Chennai, paving the way for a brighter future in renewable energy – EQ

WattPower has launched an innovative solar photovoltaic (PV) factory in Chennai, heralding a promising future for solar energy. This development represents a significant step in advancing clean energy solutions in the region. With the new factory, WattPower aims to contribute to a more sustainable and environmentally friendly energy landscape, providing a brighter and greener future […]

Petition of CERC (Connectivity and General Network Access to the Inter-State Transmission System) Regulations of the land required for grant of final connectivity – EQ

Renault Nissan Automotive India Pvt Ltd (RNAIPL) Accelerates Progress Towards 2045 Carbon Neutrality goal – EQ Mag

Three pillared sustainability strategy saves 87,500 tons of Co2 emissions every year Automotive manufacturer will be water positive by 2030 Working towards 85% renewable energy to make cars by 2030, 100% by 2045. Plant has already initiated campaign to replace banned single use plastic items with eco-friendly alternatives Chennai : Ahead of World Environment Day […]

Petition of CERC (Connectivity and General Network Access to the Inter-State Transmission System) Regulations of the land required for grant of final connectivity – EQ