To direct TANGEDCO to permit provision of net metering for all the locations listed in NOC application under 4MW – EQ Mag Pro

To direct TANGEDCO to permit provision of net metering for all the locations listed in NOC application under 4MW. For more information please see below link:

Petition of the CERC (Conduct of Business) and (Terms and Conditions of Tariff) Regulations for truing up and determination of the transmission tariff with Tehri Transmission System in the Northern Region – EQ

Net Metering Vs Gross Metering – EQ Mag Pro

The biggest change occurred in generation of electricity in this era is Distributed Generation (DG)! The change that anyone would only imagine of is true these days. Yes, it is possible to generate our own electricity. The credit goes to Renewables for sure. Customers are able to install Rooftop Solar plants and generate their own […]

Sineng Electric Completes NGCP-Witnessed Grid Requirement Test for 99 MWp Tantangan Solar Project in the Philippines – EQ

Petition For Net Metering For Roof Top Grid Connected Solar Plant Under RESCO Model – EQ Mag Pro

Petition For Net Metering For Roof Top Grid Connected Solar Plant Under RESCO Model. For more information please see below link:

Petition of the CERC (Conduct of Business) and (Terms and Conditions of Tariff) Regulations for truing up and determination of the transmission tariff with Tehri Transmission System in the Northern Region – EQ

Petifion For Seeking Directions to Provide Net Metering Facility For the Solar Rooftop Power Plant – EQ Mag Pro

Petifion For Seeking Directions to Provide Net Metering Facility For the Solar Rooftop Power Plant. For more information please see below link:

Petition of the CERC (Conduct of Business) and (Terms and Conditions of Tariff) Regulations for truing up and determination of the transmission tariff with Tehri Transmission System in the Northern Region – EQ

In the Matter of Application For Net Metering For Roof Top Grid Connected Solar Plant Under Resco Model, Adjudication or Resolution of Dispute Regarding Regulation – EQ Mag Pro

In the Matter of Application For Net Metering For Roof Top Grid Connected Solar Plant Under Resco Model, Adjudication or Resolution of Dispute Regarding Regulation of Purchase and Procurement process of electricity by Braithwaite Co Ltd. For more information please see below link:

Petition of the CERC (Conduct of Business) and (Terms and Conditions of Tariff) Regulations for truing up and determination of the transmission tariff with Tehri Transmission System in the Northern Region – EQ

Hike in Net Metering Rates to Raise Power Cost – Meralco

INCREASING the compensation of end users participating in the government’s net metering program must be thoroughly studied, as doing so will lead to higher power generation charges, Manila Electric Co. (Meralco) said. “Meralco will continue to actively support the net metering program, but we think proposals that will lead to higher power rates should be […]

Hydrogen subsidies | Australian solar-to-methanol project secures €24m grant — with half coming from Germany -EQ

Roof Top Solar PV System Permitted For Net Metering For Loads Up to 10kW, Says Draft GERC (Third Amendment) Regulations 2021- Check the Draft Here

Gujarat Electricity Regulatory Commission (GERC) has released a draft on regulations to amend GERC (Net Metering Rooftop Solar PV Grid Interactive Systems) Regulations, 2016. The commission has invited suggestions and comments from the stakeholders on the draft. These regulations, applicable to the state of Gujarat, will be called Gujarat Electricity Regulatory Commission (Net Metering Rooftop […]

Petition of the CERC (Conduct of Business) and (Terms and Conditions of Tariff) Regulations for truing up and determination of the transmission tariff with Tehri Transmission System in the Northern Region – EQ