In the matter of CERC (Conduct of Business) and (Terms and Conditions of Tariff) Regulations for Truing up and determination of the transmission tariff under “System Strengthening-XXIV” in the Southern Region – EQ

Summary: — ## **1. Assets Covered (Combined Asset)** | Asset | Description | COD | Time Overrun (condoned) | | :— | :— | :— | :— | | **Asset-A** | LILO of Kurnool–Thiruvalam 765kV D/C line + 765/400kV GIS substation at Cuddapah (2×1500 MVA ICT + 2×240 MVAR bus reactors) | 25.10.2018 | 106 […]

Petition of the CERC (Sharing of Inter-State Transmission Charges and Losses) Regulations for PGPL) and Ors. – EQ

Petition for Truing up and determination of the transmission tariff for under “Inter- regional System Strengthening Scheme in WR and NR Part-B)” as per PGCIL – EQ

Summary: — ## General Directives (Both Petitions) | Direction | Timeline | |———–|———-| | PGCIL to submit information **on affidavit** with copy to Respondents | Within **2 weeks** (by ~2 April 2026) | | Respondents to file replies (if not already filed) | Within **1 week** thereafter | | PGCIL may file rejoinder | Within […]

Petition of the CERC (Sharing of Inter-State Transmission Charges and Losses) Regulations for PGPL) and Ors. – EQ

Petition for truing up and determination of transmission tariff for the Kaiga Project in the Southern Region of the CERC (Conduct of Business) and (Terms and Conditions of Tariff) Regulations – EQ

Summary: — ## Key Directions Issued by CERC ### For Petition No. 412/TT/2025: 1. **Item-wise details** of Additional Capital Expenditure (ACE) claimed for 2019-24 and projected for 2024-29 – due to significant difference between approved and claimed figures. 2. **Equipment-wise cost estimate** for ACE projected for 2024-29. 3. **Justification & supporting documents** for contingency liability […]

Petition of the CERC (Sharing of Inter-State Transmission Charges and Losses) Regulations for PGPL) and Ors. – EQ

Petition for Truing up and determination of transmission tariff under “Transmission System associated with CSA with CEPL and IBPL and IBPL LTOA Generation Projects in Tuticorin Area-Part-A” – EQ

Summary: — ### **Key Directions by CERC** | Direction | Details | |———–|———| | **Filing of rejoinders** | PGCIL to file rejoinder to MPPMCL replies in Petitions 749 & 523 within 1 week | | **Filing of replies** | All respondents (including TNPDL in Petition 490) to file replies within 1 week | | **Information […]

Petition of the CERC (Sharing of Inter-State Transmission Charges and Losses) Regulations for PGPL) and Ors. – EQ

Petition of the CERC (Conduct of Business) and (Terms and Conditions of Tariff) Regulations for Truing up and determination of the transmission tariff for MSETCL owned Transmission Lines/Systems to other States – EQ

Summary: — ## **1. Case Overview** | **Parameter** | **Details** | | — | — | | **Petitioner** | Maharashtra State Electricity Transmission Company Limited (MSETCL) | | **Respondents** | Power Grid Corporation of India Limited (PGCIL) and others (including KPTCL) | | **Subject** | Truing up of transmission tariff for **2019–24 period** (under Tariff […]

Petition of the CERC (Sharing of Inter-State Transmission Charges and Losses) Regulations for PGPL) and Ors. – EQ

Petition for the determination of transmission tariff for asset under ‘Transmission Network Expansion in Gujarat to increase ATC from ISTS, Part-B” in the Western Region – EQ

Summary: — **Case Background:** The petition was filed by **Power Grid Corporation of India Limited (PGCIL)** before the Central Electricity Regulatory Commission (CERC). The petition seeks determination of **transmission tariff for the 2024–29 tariff period** for assets under the project: *”Transmission Network Expansion in Gujarat to increase ATC from ISTS, Part-B”* in the Western Region. […]

Petition of the CERC (Sharing of Inter-State Transmission Charges and Losses) Regulations for PGPL) and Ors. – EQ

Petition for Truing-up and determination of transmission tariff for Kahalgaon Transmission System in the Eastern Region – EQ

Summary: — The directive was issued during a hearing on **March 19, 2026**, in **Petition No. 515/TT/2025**, which seeks approval for transmission tariff true-up for the **2019–24 period** and determination for the **2024–29 period**. — ### Case Details | Parameter | Details | |———–|———| | **Petition No.** | 515/TT/2025 | | **Petitioner** | Power Grid […]

Petition of the CERC (Sharing of Inter-State Transmission Charges and Losses) Regulations for PGPL) and Ors. – EQ

Petition for Truing up and determination of transmission tariff for the Combined Asset in “Eastern Region Strengthening Scheme IX Project” in the Eastern Region – EQ

Summary: — ### Case Details | Parameter | Details | |———–|———| | **Petition No.** | 355/TT/2025 | | **Petitioner** | Power Grid Corporation of India Limited (PGCIL) | | **Respondents** | Bihar State Power (Holding) Company Limited (BSPHCL) and 5 others | | **Subject** | True-up of transmission tariff for 2019–24 period and determination for […]

Petition of the CERC (Sharing of Inter-State Transmission Charges and Losses) Regulations for PGPL) and Ors. – EQ

Petition for determination of transmission tariff of the APTRANSCO-owned ISTL flow of inter-State power for inclusion in POC Mechanism – EQ

Summary: —- #### 1. Subject Matter of the Petition The petition seeks the **determination of transmission tariff** for certain intra-State transmission lines owned by **APTRANSCO** (Transmission Corporation of Andhra Pradesh Limited). The key aspects are: – **Assets in Question:** Intra-State transmission lines owned by APTRANSCO. – **Purpose:** These lines facilitated the flow of **inter-State power** […]

Petition of the CERC (Sharing of Inter-State Transmission Charges and Losses) Regulations for PGPL) and Ors. – EQ

Petition for the determination of transmission tariff for “Strengthening of OPGW network within the Eastern Region Grid and Connectivity with other regions” in the Eastern Region – EQ

Summary: —- ### Key Procedural Developments #### 1. **Status of Pleadings** – The representatives of PGCIL submitted that the **pleadings have been completed**. They requested the Commission to consider their submissions and allow the transmission tariff for the upcoming period. #### 2. **Respondent Non-Appearance** – **None of the respondents (including BSPHCL and five others) appeared** […]

Petition of the CERC (Sharing of Inter-State Transmission Charges and Losses) Regulations for PGPL) and Ors. – EQ