IMPORTANT: Pre-bid meeting for RfS for 1200 MW ISTS-Connected Wind-Solar Hybrid Power Projects (Tranche-IV). For more information please see below link. With reference to the RfS issued for setting up of 1200 MW ISTS-Connected Wind-Solar Hybrid Power Projects (Tranche-IV), the pre-bid meeting has been scheduled on 26.04.2021, at 14:30 hrs (IST). The meeting will be […]
TARIFF FRAMEWORK FOR PROCURMENT OF POWER BY DISTRIBUTION LICENSEES AND OTHERS FROM WIND-SOLAR HYBRID PROJECTS AND OTHER COMMERCIAL ISSUES FOR THE STATE OF GUJARAT. For more information please see below link:
NIT for setting up of 1200 MW ISTS-Connected Wind-Solar Hybrid Power Projects (Tranche-IV) under tariff-based competitive bidding Notice Inviting Tender SECI hereby intimates its intent for procurement of hybrid power through a Request for Selection (RfS) document for setting up of 1200 MW ISTS-Connected Wind-Solar Hybrid Power Projects in India (Tranche-IV). The RfS document for […]
Hybridisation should not only be a means if it has to serve an end purpose. Real hybridisation is when renewable energy sets higher standard for itself in terms of scheduled delivery, dispatchability write Sunil Dayal and Navdeep Gupta Encapsulating the idea of sustainable development more than seven decades ago, the then permanent representative of India […]