1. Home
  2. India
  3. Heritage Foods commissions third 2.1 MW wind power project at Beluguppa
Heritage Foods commissions third 2.1 MW wind power project at Beluguppa

Heritage Foods commissions third 2.1 MW wind power project at Beluguppa

37
0

Heritage Foods Limited has announced the commissioning of Third 2.1 MW Wind Power Project at Beluguppa, Ananthapur District, Andhra Pradesh, India on September 27, 2017 for captive consumption.

This is Higher Capacity Wind Electrics Generator (WEG) and the plant is expected to generate 5.5 million units of Elect Power per annum.

With this, the company’s renewable energy capacity has crossed 10 MW.

Shares of Heritage Foods Limited was last trading in BSE at Rs.1438.95 as compared to the previous close of Rs. 1425.2. The total number of shares traded during the day was 1401 in over 173 trades.

The stock hit an intraday high of Rs. 1457.15 and intraday low of 1430.4. The net turnover during the day was Rs. 2023804.

Source: Equity Bulls
Anand Gupta Editor - EQ Int'l Media Network

LEAVE YOUR COMMENT

Your email address will not be published. Required fields are marked *