
Petition of CERC (Connectivity and General Network Access) Regulations for renewable energy source change – EQ
0
0
Petition of CERC (Connectivity and General Network Access) Regulations for renewable energy source change
For more information please see below link:
Related posts:
- Petition with the CERC (Connectivity and General Network access to the Inter- State Transmission System) Regulations, 2022 – EQ
- Petition of the CERC (Connectivity and General Network Access to the inter- State Transmission System) and (Grant of Connectivity, Long- Term Access and Medium-term Open Access in Inter-State Transmission and Related Matters) Regulations – EQ
- Petition of the CERC (Connectivity and General Network Access) and (Conduct of Business) Regulations, to permit the inter-se utilisation and transfer of Connectivity – EQ
- Petition of the CERC (Connectivity and General Network Access) Regulations of the Commission’s “Power to Relax” and “Power to Remove Difficulties” to CTUIL/Respondent – EQ