
Petition of the CERC (Connectivity and General Network Access to the inter- State Transmission System) and (Grant of Connectivity, Long- Term Access and Medium-term Open Access in Inter-State Transmission and Related Matters) – EQ
0
0
Petition of the CERC (Connectivity and General Network Access to the inter- State Transmission System) and (Grant of Connectivity, Long- Term Access and Medium-term Open Access in Inter-State Transmission and Related Matters)
For more information please see below link:
Related posts:
- Petition of CERC (Connectivity and General Network Access to the Inter-State Transmission System) Regulations, 2022 – EQ
- Central Electricity Regulatory Commission (Connectivity and General Network Access to the inter-State Transmission System) (First Amendment) Regulations – EQ Mag
- Petition of the CERC (Connectivity and General Network Access to the ISTS) Regulations – EQ
- Petition for Adoption of tariff of 1000 MW Wind-Solar Hybrid Power Projects connected to the inter-State Transmission System – EQ