1. Home
  2. Tag "GETCO"

Gujarat Floats Tender for 210 MW Solar PV Power Project at Jamnagar

  Tender No. GSECL/ PP/ RE/ 210MW Solar PV ,“Bid For Design, Engineering, Supply & Procurement, Construction, Erection, Testing, Commissioning And Operation And Maintenance Of 210 MW Grid Connected Solar PV Power Project At Babarzar, District Jamnagar, Gujarat”.GSECL CORP.OFFICE,P&P DEPT. For more information please see below link:

Ministry of Railways issue Tender for Implementation of GMGC solar PV system of project of 1 MWp with DBOT basis under RESCO model – EQ

Gujarat Floats Tender for 110 MW of Solar Projects to be Set Up at various GETCO Substations

  Tender No. GSECL/PP/RE&BD/110MW Solar PV/ Tender ID. -422237,Tender For “Inviting Bid For Design, Engineering, Supply & Procurement, Construction, Operation And Maintenance Of 110 MW Solar Photovoltaic Grid- Connected Ranging From 10 To 55 MW At Various Substations Of GETCO In The State Of Gujarat”GSECL CORP.OFFICE,P&P DEPT. For more information please see below link:

Ministry of Railways issue Tender for Implementation of GMGC solar PV system of project of 1 MWp with DBOT basis under RESCO model – EQ

Aditya Birla Renewables Commissioned 52.5 MW (DC) Jaloya, Gujrat

  Aditya Birla Group is an Indian multinational conglomerate, headquartered in Worli, Mumbai, Maharashtra. With over seven decades of responsible business practices, our businesses have grown into global powerhouses in a wide range of sectors – metals, pulp and fibre, chemicals, textiles, carbon black, telecom and cement and renewables energy. In renewable energy development, Aditya […]

RENEWABLE ENERGY INTEGRATION – EQ

In the matter of: Petition qua disputes over GETCO’S failure to comply inter alia with the CEA (Installation and Operation of Meters) Regulations

In the matter of: Petition under Section 86(1)(f) of the Electricity Act, 2003 qua disputes over GETCO’S failure to comply inter alia with the Central Electricity Authority (Installation and Operation of Meters) Regulations, 2006, and GETCO’s arbitrary and wrongful refusal to rectify its present metering arrangement for the Petitioner’s power plant and change the placement […]

Petition for the determination-cum-truing up of the transmission tariff for Bikaner with “Transmission System for the Evacuation of Power from REZ in Rajasthan (20 GW) under Phase III – Part J” – EQ

GSECL Floats Tender For 185 MW Solar Power Projects Ranging From 20-40 MW at Various Substations of GETCO in The State of Gujarat

Tender For “Inviting Bid for Design, Engineering, Supply & Procurement, Construction, Operation and Maintenance of 185 MW Solar Photovoltaic Grid-Connected Power Plant Ranging From 20-40 MW at Various Substations of GETCO in The State of Gujarat” For more information please see below link:

Ministry of Railways issue Tender for Implementation of GMGC solar PV system of project of 1 MWp with DBOT basis under RESCO model – EQ

In the Matter of: Petition with Gujarat  Electricity Regulatory Commission (Power Procurement from Renewable Sources)  Regulation

In the Matter of: Petition under Section 86 (1) (f) of the Electricity Act, 2003 read with Gujarat  Electricity Regulatory Commission (Power Procurement from Renewable Sources)  Regulation For more information please see below link:

Petition for the determination-cum-truing up of the transmission tariff for Bikaner with “Transmission System for the Evacuation of Power from REZ in Rajasthan (20 GW) under Phase III – Part J” – EQ