1. Home
  2. Tag "grid connected"

Pre-bid meeting: RfS for setting up of 5665 kW Grid-Connected Rooftop Solar PV Projects under RESCO Mode (RTSPV-Tranche-VIII) – EQ

Pre-bid meeting: RfS for setting up of 5665 kW Grid-Connected Rooftop Solar PV Projects under RESCO Mode (RTSPV-Tranche-VIII) This is in reference to the RfS for “Selection of Solar Power Developers for setting up of 5665 kW Grid-Connected Rooftop Solar PV Projects under RESCO Mode through Tariff-based Competitive Bidding (RTSPV-Tranche-VIII)” issued by SECI. Pre-bid meeting […]

Pre-bid meeting: RfP for Supply of 80 MW Power on Short-Term Basis Through Tariff-Based Competitive Bidding – EQ

Regional Institute of Medical Sciences issue Tender for DMSETC including warranty O&M of 1.4 MWP Grid Connected Rooftop Solar PV Systems on RESCO Mode – EQ

Summary: — ## **I. Project Overview** – **Project Name**: 1.4 MWp Grid-Connected Rooftop Solar PV System under RESCO Model – **Location**: RIMS, Lamplelpat, Imphal, Manipur, India – **Model**: RESCO (Renewable Energy Service Company) – the successful bidder will invest, install, operate, and maintain the system, supplying power to RIMS for 25 years. – **Bid Capacity**: […]

SECI issue Tender for Selection of RE Power Developers under CfD Mechanism for assured peak supply of (500 MW x 3 hrs.) – EQ

MSEDCL seeking Adoption of Tariff for long term procurement of 700 MW Solar Power from Grid Connected RE Project under ISTS Solar Tranche X-III scheme selected by SECI – EQ

Summary: —- ### **Key Prayers by MSEDCL:** 1. Admit the petition under Section 63 of the Electricity Act, 2003. 2. Approve procurement of 700 MW solar power from SECI at a tariff of **₹2.63/kWh** (including a trading margin of ₹0.07/kWh). 3. Approve the executed Power Sale Agreement (PSA) with SECI. 4. Allow the procured solar […]

Petition of the CERC (Sharing of Inter-State Transmission Charges and Losses) Regulations for RSPPL and Ors. – EQ

CEL issue Tender for DES of BoS with Solar PV Modules PIC of 4.1 MW AC Solar PV grid connected power plant at IIT Kharagpur West Bengal – EQ

Summary: —- **1. Tender Overview** * **Tender Reference:** C-2(b)/WC/0700/2526/0009 * **Issuing Authority:** Central Electronics Limited (CEL) – Materials Management Division * **Work Description:** **Design, Engineering, Supply of Balance of System (with Solar PV Modules), Procurement, Installation & Commissioning of 4.125 MW (AC) Solar Photovoltaic grid connected power plant** * **Project Location:** IIT Kharagpur, West Bengal […]

SECI issue Tender for Selection of RE Power Developers under CfD Mechanism for assured peak supply of (500 MW x 3 hrs.) – EQ

CWDB issue Tender for SITC of Grid Connected Rooftop Solar PV Power Plant at Various Locations – EQ

Summary: — ### **Project Overview** – **Project Title**: Design, Supply, Installation, Testing, and Commissioning of a **Rooftop Solar Photovoltaic System** – **Location**: *As specified in the tender document* – **Scope of Work**: Complete EPC execution including supply of solar modules, inverters, mounting structures, associated civil and electrical works, grid connectivity, testing, commissioning, and operation & […]

SECI issue Tender for Selection of RE Power Developers under CfD Mechanism for assured peak supply of (500 MW x 3 hrs.) – EQ

MPUVNL issue Tender for RfP for setting up of Grid connected Solar PV based Power Plants under Surya Mitra Krishi Feeders Scheme – EQ

Summary: —- MPUVNL Notice (PM KUSUM-C Scheme) Key Points: Financial Bid Opening: Completed for technically eligible bidders. Allotment Process: To be conducted via software program on 20 December 2025 at 5:00 PM, in offline/online presence of willing bidders. Requirements for Successful Bidders: Must accomplish all conditions and submit documents (PBG, NRED Registration, Agreement Stamp, etc.). […]

SECI issue Tender for Selection of RE Power Developers under CfD Mechanism for assured peak supply of (500 MW x 3 hrs.) – EQ

CPT issue Tender for DSITC of 2 MWp Grid Connected Roof top Solar PV Project on the 4 Nos. Exim Godowns at Chennai Port Authority under RESCO Model – EQ

Summary: —- **Key Details:** 1. **Name of the Work:** Design, supply, installation, testing, and commissioning of a 2 MWp solar rooftop system on the EXIM sheds of Chennai Port Authority, Chennai. The project falls under the rooftop solar scheme for government buildings in the Tamil Nadu region and will be executed under the RESCO (Renewable […]

SECI issue Tender for Selection of RE Power Developers under CfD Mechanism for assured peak supply of (500 MW x 3 hrs.) – EQ

IISRB issue Tender for EPC Contract for DEPSCC on Turnkey basis and Comprehensive O&M for 1O Yrs of 2.4 MW DC, 2 MW AC Grid Connected Solar PV Power Plant at IISER Bhopal – EQ

Summary: — ### **1. PROJECT OVERVIEW** – **Project:** EPC contract for design, engineering, procurement, supply, construction, commissioning, and 10-year comprehensive O&M of a 2.4 MW DC / 2 MW AC grid-connected solar power plant at IISER Bhopal. – **Scope:** Turnkey basis, including civil, electrical, structural, SCADA, evacuation to 33 kV substation, and 10-year O&M. – […]

SECI issue Tender for Selection of RE Power Developers under CfD Mechanism for assured peak supply of (500 MW x 3 hrs.) – EQ

CIL issue Tender for Setting up of Grid Connected 20 MW (AC) Floating Solar PV Power Plant at Chilwa Taal, Gorakhpur, Uttar Pradesh – EQ

Summary: — ### **Project Snapshot** * **Tendering Authority:** Coal India Limited (CIL), Government of India Enterprise * **Project Type:** Grid-connected **20 MW (AC) Floating Solar PV Power Plant** * **Location:** Chilwa Taal, Gorakhpur, Uttar Pradesh * **Tender ID:** 2025_CILHQ_349675_1 * **Estimated Project Cost:** * ₹128.64 Cr (excluding GST) * ₹140.35 Cr (including GST) — ### […]

SECI issue Tender for Selection of RE Power Developers under CfD Mechanism for assured peak supply of (500 MW x 3 hrs.) – EQ

Petition for the Adoption for procurement of power from the 760 MW Grid Connected Renewable Energy Power Projects with Energy Storage Systems – EQ

Summary: — **Background & Objective** – NTPC filed a petition under **Section 63 of the Electricity Act, 2003** for adoption of tariffs discovered through a **competitive bidding process**. – The tender was for procurement of **760 MW** of **Firm and Dispatchable Power (Assured Peak Power Supply)** from **ISTS-connected renewable energy projects with energy storage systems**. […]

Petition of the CERC (Sharing of Inter-State Transmission Charges and Losses) Regulations for RSPPL and Ors. – EQ