As per the Reassessment Study carried out by the Central Electricity Authority (CEA) during 1978-1987, the assessed hydro power potential in the country is about 145320 MW (for projects with capacity above 25 MW). Presently, 42104.6 MW (29%) out of 145320 MW has been developed and 15023.5 MW (10.3%) is under construction. The state wise hydro power potential and its status of development are attached at Annexure.

As per reports of International Hydropower Association (IHA), USA has developed more than 80% of its hydro power potential and EU has developed more than 70% of its hydro power potential.

The main challenges in development of hydroelectric potential in the country are remote location, unpredictable geology, natural calamities, environment and forest issues, Rehabilitation and Resettlement (R&R) issues, law & order issues and inter-state issues

The Government has undertaken a number of policy initiatives to enhance the hydro power generation in the country, including in Andhra Pradesh, which are, inter alia, as under:

  • Declaring Large Hydro Power (> 25 MW projects) as Renewable Energy source.
  • Provision of Hydro Purchase Obligation (HPO) as a separate entity within Renewable Purchase Obligation (RPO).
  • Notification of tariff rationalization measures to bring down hydro power tariff.
  • Provision of budgetary support for cost of Enabling Infrastructure, i.e. roads/bridges and Flood Moderation.
  • Notification of a “Dispute Avoidance Mechanism” through ‘Independent Engineer’ and “Dispute Resolution Mechanism” through “Conciliation Committee of Independent Experts (CCIE)” to expeditiously and effectively address contractual disputes.
  • Notification of guidelines to reduce the incidence of time and cost over-run in Hydro Power Projects
  • Waiver of Inter State Transmission System (ISTS) charges on transmission of electricity generated from new Hydro Electric Projects

ANNEXURE

Status of Hydro Electric Power Potential and Development (above 25 MW, as on 28.02.23)

Region/ State Identified Capacity (reassessment study) Capacity in operation Capacity under construction
NORTHERN (MW) (MW) % (MW) (%)
Jammu & Kashmir 11567 3360.0 29.0 3099.5 26.8
Ladakh 2046 89.0 4.3 0.0 0.0
Himachal Pradesh 18470 10263.0 55.6 2490.0 13.5
Punjab 971 1096.3 100.0 206.0 21.2
Haryana 64 0.0 0.0 0.0 0.0
Rajasthan 483 411.0 85.1 0.0 0.0
Uttarakhand 17998 3975.4 22.1 1571.0 8.7
Uttar Pradesh 664 501.6 75.5 0.0 0.0
Sub Total (NR) 52263 19696.3 37.7 7366.5 14.1
WESTERN          
Madhya Pradesh 1970 2235.0 100.0 400.0 20.3
Chhattisgarh 2202 120.0 5.4 0.0 0.0
Gujarat 590 550.0 100.0 0.0 0.0
Maharashtra 3314 2647.0 79.9 0.0 0.0
Goa 55 0.0 0.0 0.0 0.0
Sub total (WR) 8131 5552.0 68.3 400.0 4.9
SOUTHERN          
Andhra Pradesh 3261 1610.0 49.4 960.0 29.4
Telangana 1099 800.0 72.8 0.0 0.0
Karnataka 6459 3689.2 57.1 0.0 0.0
Kerala 3378 1864.2 55.2 140.0 4.1
Tamil Nadu 1693 1778.2 100.0 0.0 0.0
Sub Total (SR) 15890 9741.6 61.3 1100.0 6.9
EASTERN          
Jharkhand 582 210.0 36.1 0.0 0.0
Bihar 40 0.0 0.0 0.0 0.0
Odisha 2981 2154.6 72.3 0.0 0.0
West Bengal 2829 441.2 15.6 120.0 4.2
Sikkim 4248 2282.0 53.7 1037.0 24.4
Sub Total (ER) 10680 5087.8 47.6 1157.0 10.8
NORTH EASTERN          
Meghalaya 2298 322.0 14.0 0.0 0.0
Tripura 0 0.0 0.0 0.0 0.0
Manipur 1761 105.0 6.0 0.0 0.0
Assam 650 350.0 53.8 120.0 18.5
Nagaland 1452 75.0 5.2 0.0 0.0
Arunachal Pradesh 50064 1115.0 2.2 4880.0 9.7
Mizoram 2131 60.0 2.8 0.0 0.0
Sub Total (NER) 58356 2027.0 3.5 5000.0 8.6
ALL INDIA 145320 42104.6 29.0 15023.5 10.3

In addition to above 8 Pumped Storage Projects (PSPs) having capacities of 4745.6 MW are under operation and 4 PSPs having a capacity of 2780 MW are under construction.

This information was given by the Union Minister of Power Sh. R.K. Singh in the Rajya Sabha Today.