Featured September 14, 2021 Anand Gupta 0 On the auspicious occasion of Ganesh Chaturthi SECI signs PPA with M/s Evergreen Power Mauritius Pvt Ltd for 150 MW under wind Tranche X – EQ Mag Pro 0 0 0 00 0 0 more On the auspicious occasion of Ganesh Chaturthi SECI signs PPA with M/s Evergreen Power Mauritius Pvt Ltd for 150 MW under wind Tranche X – EQ Mag Pro September 14, 2021 Anand Gupta now playing Notice regarding Delay in Installation of SCADA based remote control system at IAF airfields - EQ September 14, 2021 Anand Gupta now playing Advancing Global Energy Collaboration: Sineng Electric Engages with CEEC International Delegation - EQ September 14, 2021 Anand Gupta now playing SJVN Ltd issue Tender for RfS Document for Selection of PSP Developers for Setting up of 2000 MW ESC from PSPP in India under Tariff-based Competitive Bidding - EQ September 14, 2021 Anand Gupta now playing Meeting on root cause analysis of slow progress of ISTS projects for FY 2025-26- reg. - EQ September 14, 2021 Anand Gupta now playing Petition with CERC (Procedure, Terms and Conditions for grant of Transmission Licence and other related matters) Regulations to Mandsaur I RE Transmission Limited - EQ September 14, 2021 Anand Gupta now playing Petition of the CERC (Conduct of Business) and (Terms and Conditions of Tariff) Regulations for Gazuwaka under “Gazuwaka HVDC back to back project” in the Southern Region - EQ September 14, 2021 Anand Gupta now playing Petition for Truing up and the determination of transmission tariff for Palatana-Bongaigaon Transmission System Project in the North Eastern Region - EQ September 14, 2021 Anand Gupta now playing REIL issue Tender for Rate Contract for SDS of BOS Except SPV Modules ETC and Comprehensive O&M For 5 Years of 5 MW Grid Connected RSPVP on State Govt Buildings in UT - EQ September 14, 2021 Anand Gupta now playing MES issue Tender for Comprehensive M&R of 1 MW Solar Plant at ATs Yelahanka - EQ September 14, 2021 Anand Gupta now playing House Panel Stresses Greater State Participation to Boost PM Surya Ghar Scheme - EQ September 14, 2021 Anand Gupta On the auspicious occasion of Ganesh Chaturthi SECI signs PPA with M/s Evergreen Power Mauritius Pvt Ltd for 150 MW under wind Tranche X. Related posts: SECI Signed PPA for 100 MW Solar Power With Storage With CSPDCL At Raipur Exclusive: Adani has no guaranteed customer for $6 bln Indian solar project – document Azure Power Provides an Update on 4 GW Tender SECI & ReNew Power Sign India’s 1st Round-the-Clock Renewable Energy PPA tags: Ganesh Chaturthi PPA SECI 0 00 0 0 previous Global Invitation (Through e-bidding Only) for Selection of Transmission Service Provider on Build, Own, Operate and Maintain (Boom) Basic For "Transmission System For Evacuation of Power - EQ Mag Pro next GST Council Secretariat suggests Council consider possibility of including petroleum products - EQ Mag Pro Anand Gupta Editor - EQ Int'l Media Network Related Posts Notice regarding Delay in Installation of SCADA based remote control system at IAF airfields – EQ December 12, 2025 Anand Gupta 0 Advancing Global Energy Collaboration: Sineng Electric Engages with CEEC International Delegation – EQ December 12, 2025 Anand Gupta 0 Meeting on root cause analysis of slow progress of ISTS projects for FY 2025-26- reg. – EQ December 12, 2025 Anand Gupta 0