Summary:

### **1. Document Overview**

* **Document Type:** Record of Proceedings (RoP)
* **Issued By:** Central Electricity Regulatory Commission (CERC), New Delhi
* **Petition No.:** 735/AT/2025
* **Date of Hearing:** 16th October 2025

### **2. Subject Matter**

**Petition under Section 63 of the Electricity Act, 2003**
For **adoption of tariff** discovered through **Competitive Bidding Process** for:

* **Supply of:** 1200 MW ISTS-connected Solar PV Power Projects
* **Location:** Anywhere in India
* **With:** “Greenshoe Option” for additional capacity up to **600 MW**

### **3. Parties Involved**

* **Petitioner:** NTPC Limited (NTPCL)
* **Respondents:** Bharat Petroleum Corporation Limited and others
* **Respondent No. 5:** Adynat Enersol Private Limited (AEPL)

### **4. Coram (Presiding Members)**

* Shri Ramesh Babu V., Member
* Shri Harish Dudani, Member
* Shri Ravinder Singh Dhillon, Member

### **5. Representation**

* **For Petitioner (NTPC Ltd):**

* Shri Adarsh Tripathi, Advocate
* Shri Ajitesh Garg, Advocate
* **For Respondent (AEPL):**

* Shri Harishit Malik, Advocate
* Shri Vishal Anand, Advocate
* Shri Rahul Chatwal, Advocate

### **6. Key Proceedings Summary**

1. **Submission by NTPC:**

* Petition filed for **tariff adoption** for 1200 MW Solar PV projects.
* Confirmed that **conformity certificate** has been submitted.

2. **Clarification to CERC:**

* Though the bid document included a **Greenshoe Option** (for up to 600 MW extra capacity), **no capacity was awarded** under that option.
* NTPC requested the Commission to **reserve the matter for orders**.

3. **Respondent’s Position:**

* **Adynat Enersol Pvt. Ltd.** stated it had **no objection** to the tariff adoption request.

4. **Commission’s Decision:**

* After hearing all parties, the **CERC reserved the matter for final orders**.